My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FINAL WMU FU-23 DESIGN RPT & CONCURRENCE LTRS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
COMPLIANCE INFO_FINAL WMU FU-23 DESIGN RPT & CONCURRENCE LTRS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2023 8:51:58 AM
Creation date
11/30/2023 9:10:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
FINAL WMU FU-23 DESIGN RPT & CONCURRENCE LTRS
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
257
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Manning Formula Uniform pipe Flow at C <br />Printable Title <br />Printable Subtitle <br />lnouts <br />iiven <br />Results <br />Slope and I pth <br />Flow, Q ({iiee notes)r.Q21€cl's v <br />PlnA dltmat6F d-L 1.4821 rsec v <br />5,35 lnv lVelocity h eaq, nv in H2O v <br />Manning roughness,_6 0.012 Flow area ).014i ft,\2 v <br />)ressure slope (possibly ? equal to pipe slope), Si--l 6.oQ rise/run -Wetted pr 'imeter 1.354e ftv <br />Farnanf nf /nr Hydraulic adius ).0414 ftvrv/ ,u,, veHrrr \ rvv/o ur I tr iluwiltg tuilJl 15 Yo Top width T 1.3184 ftv <br />:roude nr 1.22 <br />Average Ehear stress (tractive fofpe), tau I nrE(Psf v <br />/\(t <br />\v /\Irz <br />rtes: <br />ris is the flow and depth inslde the pipe. <br />)tting the flow into the pipe may require significanfly higher headwater depth. Add at reast 1, <br />see my2:minule-lulerial for standard culvert headwater calculations using Hy-g, <br />times the velocity to get the headwater depth <br />Notes: <br />This is <br />Getting <br />or see I
The URL can be used to link to this page
Your browser does not support the video tag.