My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023 Q1 WATER QUALITY RPT
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
2023-2026 Reports
>
COMPLIANCE INFO_2023 Q1 WATER QUALITY RPT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/31/2024 10:24:47 AM
Creation date
11/30/2023 3:49:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023 Q1 WATER QUALITY RPT
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2060
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Disposal Facility (Site) Inspection Report (52) <br />Forward Landfill, Inc. (39 -AA -0015) <br />3/31/2023 <br />nuisance or cause other problems. <br />B. Ensure litter is collected and disposed appropriately on a daily basis_ <br />C. operator shall use clean soil to cover areas evident of daylighting. <br />27 CCR 20820 - Drainage and Erosion Control <br />Erosion channels observed on side slopes and ponding observed at various areas of <br />the site. Ponding is due to recent rain events. Exposed waste was not observed. <br />A. The drainage system shall be designed and maintained to prevent exposure of <br />waste. <br />B. Repair erosion channels with clean soil. <br />C. Pump out depressions and grade surfaces to prevent future ponding. <br />Inspection Report Comments <br />Notes: <br />1. Soil and tarps are used for the daily cover. <br />2. The first truck at the active face was at 6:07 am. <br />3. Records were available for review. <br />4. An uncovered truck was observed on the roadway to the active face. Ensure all trucks are <br />covered until they reach the active face. <br />5. Sheep's are used for vegetation control. Vegetation was at a minimum. <br />6. Track out was light and the odor was moderate. <br />7. The winter pads are currently utilized. There are two areas that are being used for disposal; <br />one is for the tipper and the other is for all other trucks. <br />8. Monitoring well CP -26 was measured for methane level. The methane concentration for the <br />well was 0% for the shallow and deep probe. <br />9. It was difficult to navigate to both of the active faces due to poor road conditions at the <br />proximity of the active faces. Operator shall maintain roadways in good condition and <br />accessible to traffic in all weather conditions. <br />CalRecycle Solid Waste Information System (SWIS) Page 2 of 3 <br />r_&_ r'+_._ _ _moi- A. n ._._'I n nnnn w n.nrn As A <br />
The URL can be used to link to this page
Your browser does not support the video tag.