Laserfiche WebLink
handwash sink shall be separated from the warewash sink by a metal splashguard <br />at least 6" from back edge of the drainboard to the front edge, unless they are separated <br />by 24" or more. (114311(b)) <br />‘,1-0:Floor mounted equipment shall be sealed to floor or at least 6" off the floor on easily <br />cleanable legs and feet. (114301(g)) <br />71.-1". Equipment shall be sealed together, or spaced a minimum of 4" apart from each other. <br />(114301 (g)) <br />,;12-. Equipment joints and seams shall be tightly fitted and sealed; silicone sealant or <br />waterproof compounds if gap is smaller than 1/4 inch. (114301(b)) <br />..1-3:-No exposed threads, nuts, or rivets that interfere with proper cleaning. (114301(g)) <br />44 Provide a 10 BC-rated fire extinguisher. (114323 (c)) <br />14 ight bulbs and tubes shall be enclosed in plastic safety shield or equivalent. (114323 <br />c)) <br />Passthrough windows are limited to 216 square inches (432 square inches if equipped <br />with an air curtain), may be no closer than 18 inches from each other, each opening is <br />equipped with self-closing solid windows or screens; screen shall be at least 16 mesh/ inch. <br />(114259.2) <br />€1.6. The exhaust hood must be constructed to meet the requirements of the California <br />Mechanical Code. (114149.1) <br />-A-7-.0btain a State Mobile Food Preparation Unit "Insignia" if necessary. Contact State <br />Housing and Community Development for approval of your commercial coach at (916) 255- <br />2501 <br />„I-8: Obtain a verification of commissary. <br />The EHD must be kept informed of the construction progress. A final inspection must be <br />performed, operating permit fees paid, and approval to operate granted prior to opening for <br />business. All equipment must be installed and thorough cleaning completed prior to the final <br />inspection. Inspections must be scheduled at least 48 hours in advance. Charges for additional <br />inspections, re-inspections and/or consultations may be assessed at the EHD hourly rate of $156 <br />per hour. <br />Any item(s) inadvertently overlooked in the plan check process, which is not in compliance with <br />applicable State laws, and/or city or county ordinance codes, shall be constructed or <br />reconstructed upon request of the EHD. Inferior workmanship, equipment, or materials will not be <br />accepted for the construction or operation of a food facility. Any variance from the requirements <br />outlined in this letter will require written approval from the EHD. Approval of the submitted plans <br />shall become null and void if the work authorized is not commenced within 180 days from the date <br />of approval, or the work authorized by such plans is abandoned. In order to renew action on an <br />expired plan approval, the applicant shall submit fees equal to that of a new plan review. A copy <br />of the approved plans shall be available on site at the time of final inspection. <br />If you have any questions, please contact Kadeanne Linhares, Senior Registered Environmental <br />Health Specialist, at (209) 616-3025.