Laserfiche WebLink
PA-2300253 (A, PreApp) Referral, S00015932 Page 2 of 2 <br /> 10420 N. HWY 99 Frontage Road, Stockton January 16, 2024 <br /> Gena.Farley@waterboards.ca.gov or 209-948-7488, concerning the requirements for <br /> preliminary technical report submittal prior to issuance of building permits <br /> If the Water Board determines that an onsite well shall be used as the potable water <br /> source, a permit application to operate Small Public Water System shall be submitted to <br /> the EHD for approval prior to issuance of building permits. To issue a permit to operate, <br /> concurrence from the Water Board is required. A yearly permit to operate a public water <br /> system will be required by the EHD prior to sign off of the certificate of final occupancy <br /> (San Joaquin County Development Title, Section 9-602.010 and 9-601.030.). <br /> The supplier must possess adequate financial, managerial, and technical capability to <br /> assure delivery of pure, wholesome, and potable drinking water in accordance with San <br /> Joaquin County Development Title, Sections 9-602.010 and 9-601.030 and C.C.R., Title <br /> 22, and Health and Safety Code, Section 116525 116570. <br /> 5. Any geotechnical drilling shall be conducted under permit and inspection by The <br /> Environmental Health Department (San Joaquin County Development Title, Section 9- <br /> 601.010(b) and 9-601.020(i)). <br /> 1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjgov.org/ehd <br />