My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0015099_PA-2200165
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FREDERICK
>
22770
>
2600 - Land Use Program
>
PA-2200165
>
SU0015099_PA-2200165
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/26/2023 2:59:11 PM
Creation date
12/26/2023 2:51:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
PA-2200165
RECORD_ID
SU0015099
PE
2622
FACILITY_NAME
PA-2200165
STREET_NUMBER
22770
Direction
S
STREET_NAME
FREDERICK
STREET_TYPE
AVE
City
RIPON
Zip
95366-
APN
22813027, -28, -29
ENTERED_DATE
8/16/2022 12:00:00 AM
SITE_LOCATION
22770 S FREDERICK AVE
RECEIVED_DATE
9/1/2022 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
31 SJ COG , Inc <br /> S J C O G, Inc. <br /> San Joaquin County Multi-Species Habitat Conservation &Open Space Plan <br /> 555 East Weber Avenue • Stockton,CA 95202 • (209)235-0600 • FAX(209)235-0438 <br /> SJMSCP HOLD <br /> TO: Local Jurisdiction: Community Development Department, Planning Department, Building <br /> Department, Engineering Department, Survey Department, Transportation Department, Public <br /> p <br /> Works Department, <br /> liOther: <br /> FROM: Laurel Boyd, SJCOG, Inc. <br /> DO NOT AUTHORIZE SITE DISTURBANCE <br /> DO NOT ISSUE A BUILDING PERMIT <br /> DO NOT ISSUE FOR THIS PROJECT <br /> The landowner/developer for this site has requested coverage pursuant to the San Joaquin County Multi- <br /> Species Habitat Conservation and Open Space Plan (SJMSCP). In accordance with that agreement, the <br /> Applicant has agreed to: <br /> 1) SJMSCP Incidental Take Minimization Measures and mitigation requirement: <br /> 1. Incidental Take Minimization Measures(ITMMs)will be issued to the project and must be signed by the <br /> project applicant prior to any ground disturbance but no later than six(6)months from receipt of the ITMMs. <br /> If ITMMs are not signed within six months,the applicant must reapply for SJMSCP Coverage. Upon receipt <br /> of signed ITMMs from project applicant,SJCOG,Inc.staff will sign the ITMMs. This is the effective date <br /> of the ITMMs. <br /> 2. Under no circumstance shall ground disturbance occur without compliance and satisfaction of the ITMMs. <br /> 3. Upon issuance of fully executed ITMMs and prior to any ground disturbance,the project applicant must: <br /> a. Post a bond for payment of the applicable SJMSCP fee covering the entirety of the project acreage <br /> being covered(the bond should be valid for no longer than a 6 month period);or <br /> b. Pay the appropriate SJMSCP fee for the entirety of the project acreage being covered;or <br /> c. Dedicate land in-lieu of fees,either as conservation easements or fee title;or <br /> d. Purchase approved mitigation bank credits. <br /> 4. Within 6 months from the effective date of the ITMMs or issuance of a building permit,whichever occurs <br /> first,the project applicant must: <br /> a. Pay the appropriate SJMSCP for the entirety of the project acreage being covered;or <br /> b. Dedicate land in-lieu of fees,either as conservation easements or fee title;or <br /> c. Purchase approved mitigation bank credits. <br /> Failure to satisfy the obligations of the mitigation fee shall subject the bond to be called. <br /> Project Title: PA-2200165 (MS) <br /> Landowner: Dale R. & Eileen J. Kuil Truct Applicant: Quartaroli &Associates <br /> Assessor Parcel#s: 228-130-27,-28,-29 <br /> T , R , Section(s): <br /> Local Jurisdiction Contact: Alisa Goulart <br /> The LOCAL JURISDICTION retains responsibility for ensuring that the appropriate <br /> Incidental Take Minimization Measures are properly implemented and monitored and that <br /> appropriate fees are paid in compliance with the SJMSCP. <br />
The URL can be used to link to this page
Your browser does not support the video tag.