Laserfiche WebLink
S J C O G, Inc. <br /> 555 East Weber Avenue • Stockton,CA 95202 • (209)235-0600 • FAX(209)235-0438 <br /> San Joaquin Counhj Multi-Species Habitat Conservation&Open Space Plan (SJMSCP) <br /> iv ir4• SJMSCP RESPONSE TO LOCAL JURISDICTION(RTLJ) <br /> ADVISORY AGENCY NOTICE TO SJCOG,Inc. <br /> To: Alisa Goulart,San Joaquin County,Community Development Department <br /> From: Laurel Boyd, SJCOG, Inc. Phone: (209)235-0574 Email: boyd@sjcog.org <br /> Date: September 7, 2022 <br /> Local Jurisdiction Project Title: PA-2200165(MS) <br /> Assessor Parcel Number(s): 228-130-27, -28,-29 <br /> Local Jurisdiction Project Number: PA-2200165(MS) <br /> Total Acres to be converted from Open Space Use: Unknown <br /> Habitat Types to be Disturbed: Multi-Purpose Open Space Habitat Land <br /> Species Impact Findings: Findings to be determined by SJMSCP biologist. <br /> Dear Ms. Goulart: <br /> SJCOG, Inc. has reviewed the application referral for PA-2200165(MS). This project consists of a Lot Line Adjustment and <br /> Minor Subdivision application to result in 3 parcels and a Designated Remainder. Parcel 1 to contain a 5-acre homesite <br /> parcel. Parcel 2 to contain 10 acres. Parcel 3 to contain 2.14 acres. The Designated Remainder to contain 52.81 acres. <br /> All parcels will have access from Frederick Avenue. All parcels will utilize onsite systems for well, septic, and natural <br /> drainage. The project site is on the east side of S. Frederick Avenue, 0.8 miles north of West Ripon Road, Ripon <br /> (APN/Address: 228-130-27, -28, -29/22770 S. Frederick Avenue, Ripon). <br /> San Joaquin County is a signatory to San Joaquin County Multi-Species Habitat Conservation and Open Space Plan <br /> (SJMSCP). Participation in the SJMSCP satisfies requirements of both the state and federal endangered species acts and <br /> ensures that the impacts are mitigated below a level of significance in compliance with the California Environmental Quality <br /> Act (CEQA). The LOCAL JURISDICTION retains responsibility for ensuring that the appropriate Incidental Take <br /> Minimization Measure are properly implemented and monitored and that appropriate fees are paid in compliance with the <br /> SJMSCP. Although participation in the SJMSCP is voluntary, Local Jurisdiction/Lead Agencies should be aware that if <br /> project applicants choose against participating in the SJMSCP, they will be required to provide alternative mitigation in an <br /> amount and kind equal to that provided in the SJMSCP. <br /> At this time, the applicant is requesting a Lot Line Adjustment and Minor Subdivision with no ground <br /> disturbance. Any future ground disturbing activities (e.g. roads, curb, gutter, electrical, water, etc.) or <br /> any physical structures that require ground disturbance on this or subsequent divided parcels will be <br /> subject to participate in the SJMSCP before ANY-ground disturbance occurs and should be resubmitted <br /> to this agency. Current or future owners of this-or subdivided properties should be made aware of the <br /> conditions that are placed by the SJMSCP on future development on the created parcels. <br /> This Project is subject to the SJMSCP. This can be up to a 90-day process and it is recommended that the project <br /> applicant contact SJMSCP staff as early as possible. It is also recommended that the project applicant obtain an information <br /> package. htto://www.sicog.org <br /> Please contact SJMSCP staff regarding completing the following steps to satisfy SJMSCP requirements: <br /> ■ Schedule a SJMSCP Biologist to perform a pre-construction survey prior to any around disturbance <br /> • SJMSCP Incidental Take Minimization Measures and mitigation requirement: <br /> 1. Incidental Take Minimization Measures(ITMMs)will be issued to the project and must be signed by the project applicant prior to any <br /> ground disturbance but no later than six(6)months from receipt of the ITMMs. If ITMMs are not signed within six months,the applicant <br /> must reapply for SJMSCP Coverage. Upon receipt of signed ITMMs from project applicant,SJCOG,Inc.staff will sign the ITMMs. This <br /> is the effective date of the ITMMs. <br />