My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2024
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
3250
>
2300 - Underground Storage Tank Program
>
PR0518288
>
COMPLIANCE INFO_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2025 3:39:22 PM
Creation date
1/2/2024 1:32:23 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2024
RECORD_ID
PR0518288
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0013810
FACILITY_NAME
COSTCO WHOLESALE #658
STREET_NUMBER
3250
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95377
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
3250 W GRANT LINE RD TRACY 95377
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
278
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 of 2 <br /> SUMP & UDC ANNULAR TESTING <br /> Test Method Developed By: FX Sump Manufacturer Industry Standard ❑Professional Engineer <br /> Other(Spec) <br /> Test Method Used: X Pressure X Vacuum ❑Hydrostatic <br /> i Other(Spec) <br /> Test Equipment Used: Vacuum&Pressure gauges I Vacuum pump/Nitrogen Equipment Resolution: +/-0.25 <br /> Sump#UDC 23124 Sump# UDC 23/24 Sump# Sump# <br /> Is Sump Liquid Filled? X Yes J No X Yes No X Yes No X Yes ❑No <br /> Type of Liquid Used: Bravo Propylene Glycol Bravo Propylene Glycol <br /> Sump Material: Fiberglass Fiberglass <br /> Sump Manufacturer: Bravo Bravo <br /> Penetration Type: Bavo Bravo <br /> Wait time between applying <br /> pressure/vacuum and 15 Minutes 15 Minutes <br /> starting test: <br /> Test Start Time: 10:10am 1:OOpm <br /> Initial Reading(111): 3 Psi -25 Hg <br /> Test End Time: 11:10am 2:OOpm <br /> Final Reading(RF): 3 Psi -25 Hg <br /> Test Duration: 1 hour 1 hour <br /> Change in Reading(RF-Ri): 0 Psi -0 Hg <br /> Pass/Fail Threshold or Criteria: 0.00psi -0.0 Hg <br /> Test Result: ® Pass ❑Fail ® Pass ❑ Fail ❑ Pass ❑Fail ❑ Pass ❑ Fail <br /> Was sensor removed for testing? IX Yes i I No I I NA X Yes No NA X Yes i No i i NA X Yes i No NA <br /> Was sensor properly replaced and IXYes ❑No ❑NA X Yes -i No iI NA X Yes I No Ll NA )(Yes No NA <br /> verified I'unctional after testing? <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> Dispenser 23124 UDC Sump repairs made.Performed Final Testing/Inspection today 01/04/24 with Kristina from San Joaquin <br /> County Environmental Health on site to witness.Verified sump integrity by conducting vacuum and pressure testing.All <br /> Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary <br /> containment,such as systems that are hydrostatically monitored or under constant vacuum,are exempt from periodic containment <br /> testing. {California Code of Regulations,Title 23,Section 2637(a)(6)) <br />
The URL can be used to link to this page
Your browser does not support the video tag.