Laserfiche WebLink
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 10. MONITORING SITE PLAN <br /> Date site plan was prepared: 1/25/2024 <br /> If a site plan has been prepared that shows all required information, you may include it, rather than this page, <br /> with your Monitoring System Certification Form. The site plan must show the general layout of tanks and <br /> identify locations of the monitoring panel, and all leak detection equipment and monitoring locations. Include <br /> a legend for all symbols depicted. <br /> UST Monitoring Site Plan <br /> Site Address: 130 SOUTH WILSON WAY STOCKTON CA 95205 <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . KEY <br /> *PIPING* . . . . . . . . . . . . . . . . 8. . . . . . . . . . . . . . . . . . . . . . . . . . A=ANNULAR <br /> (ARROWS) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . F=FILLS <br /> Drawing of piping . . . . . . . . . . . . . . .7. . . . . . . . . . . . . . . . . . . . . . . . T=TURBINE <br /> exit of sump and . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . P=PROBE <br /> UDC's.NoV=VAPOR <br /> underground 8. X=SUMP SENSOR <br /> drawing is L=Leak Detector <br /> accurate,we . . . . . . . . . 4. . . . . . . . . . . . . . . . . . . . . . . . M=Manway <br /> cannot speculate . . . ' . . ' ' . ' ' ' ' 'S' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' B=Brine Sensor <br /> blue prints. ' ' ' ' . ' '3. ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' I=Smart Sensor <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . S=STP <br /> v C=Floats&Chains <br /> . . . . . . . . . . . . . . . 2. . . . . . . . . . . . . . . . . . . E E Stop <br /> = <br /> . . . . . . . . . . . . . . . . . . . . . . .1 . x . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . N <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . g IN <br /> .87 MAIN. . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . F O . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . O <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> O O RO O R 91. <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . O . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . R R . . . . . . . . . . <br /> nTG O F V T .87 SLAVE . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A . . . . . . . . . . <br /> P <br /> . . . .COQ. .VENTS . .O. .CAS. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> VENT SUMP <br /> �'naar�rrre�rgrorarlrlr�ara xflf tiisibla ro flea esr7{�ng raclaricrare m�R n <br /> PrQfessiarvu3upirrwro�nrrfmasda��,�6orif�,x�n�iw�alprrrpus� Dxmrrr� <br /> MW fu seder <br /> Date map was drawn:1/25/21 <br /> Instructions <br /> If you already have a diagram that shows all required information,you may include it,rather than this page,with your Monitoring System Certification. On your site plan, <br /> show the general layout of tanks and piping. Clearly identify locations of the following equipment,if installed:monitoring system control panels;sensors monitoring tank <br /> annular spaces,sumps,dispenser pans,spill containers,or other secondary containment areas;mechanical or electronic line leak detectors;and in-tank liquid level <br /> probes(if used for leak detection). In the space provided,note the date this Site Plan was prepared. <br /> Monitoring System Certification Page 4 of 4 2/21/07 <br /> Page 6 of 6 <br />