Laserfiche WebLink
reawd iulaiv <br /> Underground Storage Tank <br /> Overfill Prevention Equipment Inspection Report <br /> 6. OVERFILL PREVENTION EQUIPMENT DETAILS <br /> Tank ID (one OPE per column) T1 87M T2 875 T3 91 <br /> Are both vent and tank riser piping ® Yes ® Yes ® Yes M Yes <br /> secondarily contained? ® No ® No lj No ® No <br /> OPE Model 71 50 71 50 71 50 <br /> What is the OPE response when ® Shut off Shut off [X Shut off In Shut off <br /> activated? Flow Flow Flow Flow <br /> (Check all that apply.) C Restricts i Restricts lJ Restricts ll Restricts <br /> Flow Flow Flow Flow <br /> Audible ® Audible ll Audible ll Audible <br /> Alarm Alarm Alarm Alarm <br /> ® Visual lJ Visual ® Visual 0 Visual <br /> Alarm Alarm Alarm Alarm <br /> Are flow restrictors installed on vent piping ® Yes* 01 Yes* ® Yes* ® Yes* <br /> that may interfere with the OPE operation? No BA No VA No No <br /> At what level in the tank is the OPE set to 81 3/8" 81 318" 81 318" <br /> activate? Inches from bottom of tank <br /> What is the percent capacity of the tank at <br /> which the OPE activates? 9q lo �N�� ���0 <br /> Is the OPE in proper operating condition to l Yes ® Yes* Yes* ® Yes* <br /> respond when the stored substance ® No No ® No ® No <br /> reaches the designated regulatory level? <br /> 7. SUMMARY OF TESTING RESULTS <br /> OPE Inspection Results Pass Q Pass i✓ Pass ® Pass <br /> Fail Fail Fail [ Fail <br /> 8. COMMENTS <br /> Describe all answers marked "No" or "Fail"and proposed remedy. <br /> List all monitoring equipment either replaced or repaired. <br /> Close out permit SR 0687757 <br /> * Mark here if: <br /> ® Flow restrictors interfere with overfill prevention and equipment repairs required. <br /> Additional copies of this page may be attached. <br /> Attach tank chart(s), measurements, calculations, and In-Tank Setup report(s) <br /> Page 2 of 2 <br />