Laserfiche WebLink
S A N J 0 A Q I I I Irl Environmental Health Department <br /> CCUNr <br /> Underground Storage Tank Program Inspection Report <br /> Facility Name: Facility Address: Date: <br /> TRACY USD-SERVICE CENTER 1975 W LOWELL AVE, TRACY January 19, 2024 <br /> Single-Walled Non-Pressurized Piping <br /> 404 CCR 2643(e),2661(f) Failure to conduct 0.1 gph test on single-walled gravity piping biennially or post repair(pre-1984) ❑V ❑R ❑COS <br /> Other Violations <br /> 2010 See below Unlisted General violation ❑V ❑R ❑COS <br /> SUMMARY OF VIOLATIONS <br /> (CLASS I,CLASS II,or MINOR-Notice to Comply) <br /> Item# Remarks <br /> 203 CCR 2712(b)(1-2)Failure to maintain monitoring records for 36 months and maintenance records for 60 months. <br /> OBSERVATION: Maintenance and monitoring records for the last three years were not found on site. <br /> -Secondary Containment Testing for 12/15/2023 <br /> REGULATION GUIDANCE: These records shall be maintained on site for at least three years. Monitoring records <br /> include: (1)date and time of all monitoring or sampling; (2)monitoring equipment calibration and maintenance <br /> records; (3)results of any visual observations; (4)results of sample analysis performed a lab or in the field; (5)logs <br /> of all readings of gauges or other monitoring equipment, ground water elevations, or other test results; (6)results of <br /> inventory readings and reconciliations. <br /> CORRECTIVE ACTION: Immediately locate and maintain all missing maintenance and monitoring records for the <br /> last three years on site. Submit copies of any missing work orders and alarm records to the EHD. <br /> This is a minor violation. <br /> 208 CCR 2716(a-e) Failure to comply with the designated operator inspection requirements. <br /> OBSERVATION: The designated operator failed to check and note the correct test dates for the Overfill Prevention <br /> testing on the designated operator inspection reports. The incorrect date of 10/19/2021 was documented on the <br /> 1/26/2023 DO report.The correct date for the Overfill Prevention test is 9/27/2023. <br /> REGULATION GUIDANCE: During the inspection, the designated operator shall check that all required testing and <br /> maintenance for the UST system have been completed and document the dates they were done. <br /> CORRECTIVE ACTION: Ensure that designated operators performing inspections at this facility are including all of <br /> the required information on the reports. <br /> This is a repeat violation, Class II. <br /> Overall Inspection Comments: <br /> An inspection checklist was provided to the facility operator on the day of inspection. A complete report was <br /> finished on 1/24/2024 and replaces the initial checklist. <br /> Complete and submit a copy of the Return to Compliance Certification form to the EHD with a statement <br /> documenting the corrective actions that have been or will be taken for each violation, and any supporting <br /> paperwork, within 30 days of receiving the complete inspection report. <br /> Bryan Kilby ICC: 7/20/2025 <br /> OPW SiteSentinel iTouch Console: 12/23/2024 <br /> FA0004044 PR0232521 SCO01 01/19/2024 <br /> EHD 23-01 Rev.12/06/2021 Page 4 of 5 Underground Storage Tank Program OIR <br /> 1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjgov.org/EHD <br />