Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 6. TANK SECONDARY CONTAINMENT TEST <br /> Test Method Developed by ❑ Manufacturer © Industry Standard ❑ Professional Engineer <br /> Test Type ❑ Pressure © Vacuum ❑ Hydrostatic <br /> Test Equipment Used: Vacuum Pump/Vacuum Gauges in Hg. <br /> Tank ID 1-Regular 87 2-Diesel <br /> Tank Manufacturer Arrow Tank Arrow Tank <br /> Tank Capacity 10K 10K <br /> Test Start Time 10:50 10:50 <br /> Initial Reading -10" Hg. -10" Hg. <br /> Test End Time 11:50 11:50 <br /> Final Reading -10" Hg. -10" Hg. <br /> Change in Reading 0" Hg. 0" Hg. <br /> Pass/Fail Criteria No Loss No Loss <br /> Tightness Test Results ® Pass ❑ Fail I ® Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> 7. PIPE SECONDARY CONTAINMENT TEST <br /> Test Method Developed by ❑ Manufacturer ® Industry Standard ❑ Professional Engineer <br /> Test Type ® Pressure ❑ Vacuum ❑ Hydrostatic <br /> Test Equipment Used: Pressure Gauges in Psi/Nitrogen <br /> Pipe Run ID 1-Regular 87 2-Diesel 3-Regular 87 4-Diesel <br /> Pipe Manufacturer Ameron Ameron Ameron Ameron <br /> Test Start Time 10:34 10:31 10:35 10:35 <br /> Initial Reading 5 Psi 5 Psi 5 Psi 5 Psi <br /> Test End Time 11:34 11:31 11:35 11:35 <br /> Final Reading 5 Psi 5 Psi 5 Psi 5 Psi <br /> Change in Reading 0 Psi 0 Psi 0 Psi 0 Psi <br /> Pass/Fail Criteria No Loss No Loss No Loss No Loss <br /> Tightness Test Results © Pass ❑ Fail © Pass ❑ Fail ® Pass ❑ Fail ® Pass ❑ Fail <br /> Pipe Run ID <br /> Pipe Manufacturer <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pass/Fail Criteria <br /> Tightness Test Results ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail'and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 2of5 <br />