My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2024
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
5611
>
2300 - Underground Storage Tank Program
>
PR0231764
>
COMPLIANCE INFO_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/16/2026 6:59:49 PM
Creation date
1/3/2024 2:35:32 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2024
RECORD_ID
PR0231764
PE
2361 - UST FACILITY
FACILITY_ID
FA0002160
FACILITY_NAME
BLACKHAWK PETROLEUM
STREET_NUMBER
5611
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
08710052
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
5611 E WATERLOO RD STOCKTON 95215
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br />the COMMENTS section. <br />Page 3 of 5 <br />Test Method Developed by Manufacturer Industry Standard Professional Engineer <br />Test Type Pressure Vacuum Hydrostatic <br />Test Equipment Used: Caldwell Level Change Indicator <br />Sump/UDC ID 1-87-PS 2-91-PS 3-Dsl-PS <br />Sump Manufacturer Western FG Western FG Western FG <br />Sump Depth (inches) 40" 39 1/2" 40" <br />Sump Bottom to Top of <br />Highest Pipe Penetration <br />(inches) <br />15" 17" 15" <br />Test Start Time 8:47 8:52 9:37 <br />Initial Reading .001 .001 .001 <br />Test End Time 9:17 9:22 10:07 <br />Final Reading .001 .001 .001 <br />Change in Reading 0 0 0 <br />Pass/Fail Criteria > .002 > .002 > .002 <br />Tightness Test Results Pass Fail Pass Fail Pass Fail Pass Fail <br />Sump/UDC ID UDC 1&2 UDC 3&4 UDC 5&6 UDC 7&8 <br />Sump Manufacturer Bravo Bravo Bravo Bravo <br />Sump Depth (inches) 9" 9" 9" 9" <br />Sump Bottom to Top of <br />Highest Pipe Penetration <br />(inches) <br />BP BP BP BP <br />Test Start Time 9:02 8:57 9:47 9:42 <br />Initial Reading .001 .001 .001 .001 <br />Test End Time 9:32 9:27 10:17 10:12 <br />Final Reading .001 .001 .001 .001 <br />Change in Reading 0 0 0 0 <br />Pass/Fail Criteria > .002 > .002 > .002 > .002 <br />Tightness Test Results Pass Fail Pass Fail Pass Fail Pass Fail <br />Additional copies of this page may be attached. <br /> <br />8. SUMP/UDC TEST
The URL can be used to link to this page
Your browser does not support the video tag.