My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2014-2017
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
500
>
4400 - Solid Waste Program
>
PR0504201
>
COMPLIANCE INFO_2014-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2024 2:57:37 PM
Creation date
1/8/2024 2:33:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2014-2017
RECORD_ID
PR0504201
PE
4430
FACILITY_ID
FA0000214
FACILITY_NAME
PILKINGTON NORTH AMERICA INC PLANT 10
STREET_NUMBER
500
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330-9739
CURRENT_STATUS
01
SITE_LOCATION
500 E LOUISE AVE
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
366
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Brusca File No. 137-002 <br /> <br />Page 6 <br />August 10, 2017 <br />Murphy Parkway Property Soil Gas Monitoring Workplan <br /> <br />Laboratory Testing <br /> <br />Soil gas samples collected from the soil gas monitoring wells will be transported to a State- <br />certified laboratory for analysis. The soil gas samples will be analyzed for methane, oxygen, <br />carbon dioxide, and nitrogen by ASTM Method D1946. The samples also will be analyzed for <br />volatile organic compounds by EPA Test Method TO-15. Internal laboratory QA/QC data will be <br />presented along with the laboratory report. <br /> <br /> <br />REPORTING <br /> <br />Following the installation of the soil gas monitoring wells and initial soil gas sampling/testing, <br />we will prepare a summary report which will include: descriptions of our procedures and <br />observations; scaled site plan drawings; soil gas monitoring well logs; the laboratory data; <br />discussion regarding the results; and, the signature and stamp of the Professional Geologist in <br />charge of the project. Subsequent soil gas monitoring reports will be completed following each <br />quarterly and annual sampling episode. The soil gas monitoring reports will be submitted to the <br />SJCEHD. <br /> <br /> <br />CLOSING <br /> <br />This Workplan will be submitted to the SJCEHD for review and comment prior to implementing <br />the work. If you have any questions or require additional information, please contact the <br />undersigned at (916) 677-1470. <br /> <br /> <br />Sincerely, <br /> <br />BRUSCA ASSOCIATES, INC. <br /> <br /> <br /> <br /> <br />Joe Brusca <br />Principal Engineering Geologist <br />Certified Engineering Geologist No. 1948 <br /> <br /> <br />Attachments: Plate 1, Vicinity Map <br />Plate 2, Site Map <br /> Plate 3, Planned Soil Gas Monitoring Well Detail <br /> <br />JB:jb
The URL can be used to link to this page
Your browser does not support the video tag.