Laserfiche WebLink
• www. opw toobai. com <br /> a <br /> Materials Important OPW 71SO Overfill <br /> Valve body : Cast aluminum In order to prevent product Prevention Valves <br /> Y spillage from the Underground <br /> Float: Nitrile rubber, closed cell foam # Storage Tank (UST), properly <br /> maintained delivery equipment The CARB-certified OPW 71 SO <br /> Valve : Aluminum and a proper connection at the <br /> tight-fill adaptor are essential . vapor-tight Overfill Prevention Valve <br /> Seals : Vlton® Delivery personnel should be <br /> Upper & lower Drop Tube : Aluminum managed and trained to inspect is designed to prevent the overfill of <br /> delivery elbows and hoses for underground storage tanks by providing <br /> Plastic parts : Acetal damaged and missing parts , a positive shut-off of product delivery. <br /> Hardware: Stainless steel They should always make certain <br /> The shut-off valve is an integral art of <br /> certain there is a positive g <br /> connection between the adaptor the drop tube used for gravity filling. <br /> Features and elbow. If delivery equipment The OPW 71 SO allows easy installation <br /> is not properly maintained , or the <br /> ♦ Simple, Easy and Quick Installation — elbow is not securely coupled (without breaking concrete) and requires <br /> p Y to the adaptor, a serious spill no special manholes. <br /> no excavation or special manholes may result when the OPW 71 SO <br /> closes, causing a hazard and The OPW 71 SO is a vapor-tight two- <br /> required . environmental contamination , stage shut-off valve . When the liquid <br /> ♦ Economical — costs a fraction of level rises to about 95% of tank capacity, <br /> expensive, complicated and difficult- NOTE : The DPW 71 SO is <br /> designed for use on tight-fill the valve mechanism is released , <br /> to-install valves . gravity drop applications only. closing automatically with the flow. This <br /> ♦ Furnished Complete — supplied p d <br /> not use for pressure fill <br /> areduces the flow rate to approximately <br /> applications. PP Y <br /> with new upper and lower drop tubes , 5 gpm through a bypass valve . The <br /> mounting hardware and thorough operator may then stop the filling <br /> instructions for quick job site time . process and disconnect and drain the <br /> ♦ Completely Automatic Operation — no ♦ Retrofits Directly — for both new and delivery hose . As long as the liquid <br /> prechecks to perform , no resets and no existing tanks with 4" fill risers . exceeds the 95 % level , the valve will <br /> overrides to be broken or abused . ♦ Quick Drain Feature — automatically close automatically each time delivery <br /> ♦ No Pressurization of the Tank — drains hose when head pressure is is attempted . <br /> operates directly from liquid level . relieved . If the delivery is not stopped and <br /> ♦ Will Accept a Dipstick for Gauging ♦ Best Flow Rate in The Industry* the liquid rises to about 98 % of tank <br /> capacity, the bypass valve closes <br /> completely. No additional liquid can flow <br /> Advantages of Overfill Prevention into the tank until the level drops below <br /> Compared to Overfill Warning Systems: a reset point . <br /> ♦ Completely Automatic Operation ♦ Speeds Delivery Operations — NOTE : The 71SO Overfill Prevention <br /> — does not rely on the alertness or product flows unimpeded into the tank Valve can be adjusted to shutoff at any <br /> speed of response of the delivery until the hose "kick" that accompanies desired tank capacity. Please contact <br /> attendant for certainty of overfill the valve shut-off provides a clear the Authority Having Jurisdiction (AHJ ) <br /> prevention . signal that the liquid has reached the and review local , state , and national <br /> ♦ Keeps the Top of UST " Dry, " per shut-off level . codes to determine the regulatory <br /> EPA Requirements — eliminating ♦ Simple and Inexpensive Installation — requirements governing shut-off <br /> possible leaks at loose bung fittings in both two-point and coaxial fill capacity in your region , as well as <br /> and the need for double containment applications , no additional excavation , take into account other considerations <br /> on vent lines . manholes or vent piping are required . such as extreme tank tilt. In all cases , <br /> ♦ Does Not Rely on Pressure in the the upper tube must protrude into the <br /> UST to Stop Flow — allowing faster fill tank at least 6 1l2 " to ensure that the <br /> times and reducing spill risk. valve can shut off flow into the tank <br /> completely before the top of the tank <br /> is wetted as per EPA requirements . <br /> Listings and — Look for this label for <br /> 0 ULC authentic OPW EVR 71SO Instruction Sheet Order <br /> Certifications California Air Approved products. <br /> Resources Board ovw� Number: H15524PA <br /> 102 9393 Princeton-Glendale Road . Hamilton, Ohio USA 45011 s Phone: (800) 422-2525 s Fax: (800) 421 -3297 020113 OPW Fueling Components <br />