Laserfiche WebLink
The following is an itemized list of underground storage tank violations that have not <br /> been addressed for YRC INC as of March 28, 2024. <br /> Open violations from February 14, 2024 inspection <br /> Violation#202-Failure to retain a paper or electronic copy of the permit to operate at the facility. <br /> OBSERVATION:A current copy of the UST operating permit was not found on site. The most recent permit on site <br /> was dated 2022 <br /> REGULATION GUIDANCE:A copy of the UST operating permit and all attachments and conditions shall be <br /> retained at the facility. <br /> CORRECTIVE ACTION: Immediately obtain a copy of the 2024 permit and retain it on site. <br /> ❑ This violation was corrected ❑This violation will be corrected by(date): <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation: <br /> Violation#208-Failure to comply with the designated operator inspection requirements. <br /> OBSERVATION: The designated operator inspection for the following month were performed more than 30 days <br /> after the previous inspection: <br /> - Initial inspection was performed on 08/30/2023, next inspection performed on 10/11/2023 (42 days between the <br /> two dates). <br /> REGULATION GUIDANCE: The designated operator visual inspections shall be conducted within 30 days or less of <br /> the previous inspection. <br /> CORRECTIVE ACTION: Ensure that all designated operator inspections are performed within the required time <br /> frames. <br /> ❑ This violation was corrected ❑This violation will be corrected by(date): <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation: <br /> Page 1 of 1 <br />