My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2024
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2905
>
2300 - Underground Storage Tank Program
>
PR0231952
>
COMPLIANCE INFO_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2025 3:16:24 PM
Creation date
1/12/2024 4:14:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2024
RECORD_ID
PR0231952
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0003712
FACILITY_NAME
CHEVRON STATION #94275*
STREET_NUMBER
2905
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09760004
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\lsauers1
Supplemental fields
Site Address
2905 W BENJAMIN HOLT DR STOCKTON 95207
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SA N J O A Q U I N Environmental Health Department <br />COU NTY_.___- <br />UST SYSTEM RETROFIT OR REPAIR <br />(Submit minimum of 3 sets of plans & applications as originals will be retained by EHD) <br />1. Site map enclosed? YES [ ] NO [ ] <br />2. Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training <br />certificates for each person installing or testing any component that is repaired or replaced. Ensure a copy of <br />the "Site Health and Safety Plan" is available on the jobsite as required by Title 8. <br />3. Detai{ed description of work to be completed. List components to be repaired or rep{aced and attach a <br />diagram drawn to scale showing location of repairs and/or replacements. If repairing a component, describe <br />how this will be done. (If adding piping, UDC's, or other UST equipment, or performing tank top upgrade, <br />use the UST Installation Application pages 4-8 as necessary for a timely plan review): <br />Replace the chase line penetration in the 91 fill sump with a new Bravo Double Wall <br />penetration. Work to be performed from within the sump and will not require breaking ground. See <br />attached cut sheet for new penetration fitting. <br />4. List of equipment to be used (Attach manufacturer's specification sheets showing third -party approval): <br />Bravo Double Wall Retrofit Penetration Fitting. Bravo RLX-63-05-F Penetration <br />Fitting <br />5. Decontamination Procedures: <br />a. Will piping be decontaminated prior to removal? <br />b. Identify contractor performing decontamination: <br />Address <br />KZ�3Lr', <br />YES [ ] <br />Phone <br />City <br />NO[xj <br />Zip <br />
The URL can be used to link to this page
Your browser does not support the video tag.