My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2018-2022
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
500
>
4400 - Solid Waste Program
>
PR0504201
>
COMPLIANCE INFO_2018-2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2024 4:20:13 PM
Creation date
1/18/2024 11:06:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2018-2022
RECORD_ID
PR0504201
PE
4430
FACILITY_ID
FA0000214
FACILITY_NAME
PILKINGTON NORTH AMERICA INC PLANT 10
STREET_NUMBER
500
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330-9739
CURRENT_STATUS
01
SITE_LOCATION
500 E LOUISE AVE
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
199
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Closed Disposal <br />Site Inspection Report (188) <br />Enforcement Agency: <br />Local Inspection ID: <br />County of San Joaquin <br />SWIS Facility File Number (99-xx-9999) - <br />Inspection <br />Date <br />Program Code <br />39 -CR -0022 <br />6/21/2018 <br />LEA Periodic <br />Time In <br />Time Out <br />Inspection Time <br />Facility Name <br />Received By <br />Pilkington North America, Inc. <br />Libbey-Owens Ford <br />Facility Location - <br />Owner Name <br />500 E Louise Ave., Lathrop,ca, Lathrop <br />95330 <br />Inspector <br />Also Present (Name) <br />Natalia Subbotnikova <br />X No Violations or Areas of Concern <br />1. The site is being considered for redevelopment. There is an Excavation and Materials Management Plan that has beer <br />approved by the EHD and the Region Water Quality Control Board. There has been concurrence with the plan from the <br />Cal Recycle. The sampling of the soils plan for reuse is complete. <br />2. The EHD received Waste Materials Reuse Work plan dated May 18, 2018 for the onsite reuse of solid waste materials <br />and associated soils that were excavated, stockpiled, tested, and evaluated at the property as a part of clean closure <br />activities. <br />3. Regardless of removal of all other on site waste, this site will not be considered for clean -closure due to non -removal <br />of T29 waste pile. <br />4. The EHD received the monitoring/sampling results of the two soil gas monitoring wells (SGMW 1 and SGMW 2) from <br />May 2018. Data do not indicate elevated concentrations of methane or VOC's in soil gas at the monitoring well locations. <br />5. No new unapproved site work was observed. <br />6. No violations or areas of concern. <br />CalRecycle Solid Waste Information System (SWIS) 7 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.