My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2024
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
35
>
2300 - Underground Storage Tank Program
>
PR0231320
>
COMPLIANCE INFO_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2025 9:11:31 AM
Creation date
1/19/2024 11:08:01 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2024
RECORD_ID
PR0231320
PE
2361 - UST FACILITY
FACILITY_ID
FA0003602
FACILITY_NAME
TESORO (SPEEDWAY) 68151
STREET_NUMBER
35
Direction
N
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04318003
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\lsauers1
Supplemental fields
Site Address
35 N CHEROKEE LN LODI 95240
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WEN <br /> .ftiffonCompliance Dept, <br /> AIWL ad 680 Quinn Ave <br /> San Jose, CA 95112 <br /> byMMIS, ■ 408-213-6039 - Office <br /> 408-213il m Fax <br /> April 23 , 2024 <br /> TO : San Joaquin County EHD <br /> FR : Christina Tran, Service Station Systems <br /> RE : Speedway; 35 N Cherokee Lane, Lodi ; TLS450 installation <br /> I am sending you the permit application and other documents relating to the scope of <br /> work for the above-listed site . Excavation will not be required . <br /> Scope of work . <br /> • Remove the Incon and TLS - 350 monitoring panel and install 1 TLS -450 with <br /> wireless communication to the VR flow meters and VR UDC sensors . <br /> • Plumb in the VR Flow meters , VR pressure sensor in all dispensers . <br /> • Installing Bravo retrofit level kits and removing dividers are required by CUPA . <br /> • Start up , certify, and complete all inspections with the inspector and get permits <br /> signed off. <br /> • As required with Air Quality, return, and complete the required post construction' <br /> AQ testing. <br /> Technicians from Able Maintenance will work with technicians from Service Station <br /> Systems to do the work related to the Bravo products . <br /> If you need any additional information or have any questions , please let me know as soon <br /> as possible . <br /> Thank you for helping us resolve the situation in a timely manner. <br /> La �% <br /> Christina Tran <br /> Permit & Project Coordinator <br /> Service Station Systems, Inc . APR 2 5 2024 <br /> 680 Quinn Ave, San Jose, CA 95112 <br /> PH : 408 . 213 . 6039 ENVIRONMENTAL HEALTH <br /> christinat a,servicestationsystems . com PERMIT/ SERVICES <br />
The URL can be used to link to this page
Your browser does not support the video tag.