My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2024
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
35
>
2300 - Underground Storage Tank Program
>
PR0231320
>
COMPLIANCE INFO_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2025 9:11:31 AM
Creation date
1/19/2024 11:08:01 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2024
RECORD_ID
PR0231320
PE
2361 - UST FACILITY
FACILITY_ID
FA0003602
FACILITY_NAME
TESORO (SPEEDWAY) 68151
STREET_NUMBER
35
Direction
N
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04318003
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\lsauers1
Supplemental fields
Site Address
35 N CHEROKEE LN LODI 95240
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 7. LINE LEAK DETECTOR TESTING <br /> LJ Check this box if line leak detectors ARE NOT installed. (Do not complete this section.) <br /> Simulated release rate verified: (Check all that apply.) Yes No I <br /> ✓! 3 GPH LJ 0.1 GPH Ll 0.2 GPH <br /> Has the testing apparatus been properly calibrated? a 0 D <br /> For emergency generator tank systems, does the LLD create an audible and visual Lj LA 0 <br /> alarm when a leak is detected? <br /> For mechanical LLDs, does the LLD restrict the flow through the pipe when a ® Ll L1 <br /> release is detected? <br /> For electronic LLDs, does the turbine automatically shut off when a release is Ll Li 121 <br /> detected? <br /> For electronic LLDs, does the turbine automatically shut off if any portion of the El <br /> monitoring system is disabled or disconnected? <br /> For electronic LLDs, does the turbine automatically shut off if any portion of the Ll 0 <br /> 91 <br /> monitorinq system maifunctioIns or fails a tightness test? <br /> For electronic LLDs, have all accessible wiring connections been Visually inspected Ll Lj A <br /> for kinks and breaks? <br /> Were all items on the equipment manufacturer's maintenance checklist completed? ® 0 ll <br /> Were all LLDs confirmed operational within regulatory requirements? 0 L11 Lj <br /> LLD ID LLD Model Liras Monitored Pass Fail <br /> T1 Red Jacket FX1V REG. PROD. LINE 0 12 <br /> T2 Vaporless LD-2000 PREM. PROD. LINE V) Q <br /> T3 Vaporless LD-2000 DSL PROD. LINE <br /> Lj L_f <br /> Q LI <br /> ® Ll <br /> Ll 11 <br /> L] Lj <br /> D Ll <br /> Lj Li <br /> Ej Lj <br /> Q Q <br /> Describe all answers marked "No"or `Fail"and proposed remedy it Section 9. <br /> List all monitoring equipment either replaced or repairer!in Section 9 <br /> Page 4 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.