My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2024
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
574
>
2300 - Underground Storage Tank Program
>
PR0231405
>
COMPLIANCE INFO_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2025 10:53:35 AM
Creation date
1/19/2024 11:12:34 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2024
RECORD_ID
PR0231405
PE
2361 - UST FACILITY
FACILITY_ID
FA0003164
FACILITY_NAME
NORTH POLE GAS & FOOD INC
STREET_NUMBER
574
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\lsauers1
Supplemental fields
Site Address
574 W GRANT LINE RD TRACY 95376
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Appendix B <br /> 71 SO Overfill Valve in Tank Initial Shut off Level Worksheet <br /> Important: This is meant to be supplemental worksheet and not a substitute to following the installation <br /> manual instructions. All length measurements are in inches. Please contact the Authority Having Jurisdic- <br /> tion (AHJ)and review local,state,and national codes to determine the regulatory requirements governing <br /> shut-off capacity in your region,as well as take into account other considerations such as extreme tank tilt. <br /> Take the following measurements with the valve in- <br /> stalled in the tank: _____ <br /> Distance from the 71 SO inlet tube flange to the cast <br /> lug in the 71 SO body(see figures),upper tube length. <br /> Note: the Upper Tube Length must be at least 16"to in- <br /> clude the protective bend in the tube. <br /> (D)= o <br /> Distance from the 71 SO inlet tube flange to the top and <br /> bottom of lower tube,valve length. (D) <br /> (W)- Upper <br /> (U)= Tube <br /> Distance from the 71 SO inlet tube flange to the bottom <br /> of the tank. Note:If a tank bottom protector is present it <br /> may be necessary to add this thickness to dimension <br /> (OPW 6111 &61 TP models add 0.6") (W)Valve <br /> (B)= Length, <br /> bottom of '1 <br /> From the tank calibration chart provided by tank manu- cut <br /> facturer find the dipstick number(Y)which corresponds <br /> to the 100%volume. (B) <br /> (Y)= To Tank <br /> (Y) <br /> 1. To determine shut-off percentage: Tank <br /> Subtract upper tube length (D)from distance to tank (U)Valve Chart <br /> bottom (B) Length, 100% j <br /> (X)= (B)-(D)-2"= top of cut Volume Ij <br /> Dipstick j <br /> Using the tank calibration chart provided by the tank <br /> manufacturer determine the tank capacity at the cal- <br /> culated (X) dimension and the 100%volume(Y)tank <br /> capacity. ;? <br /> (X)tank capacity in gallons= <br /> (Y)tank capacity in gallons= <br /> .� <br /> SO%=(X)capacity/(Y)capacity x100= <br /> Note: The overfill valve must be installed per AM require- <br /> ments and all applicable local,state,and national codes. If <br /> the overfill valve is set above the allowable shut-off percent- <br /> age the overfill valve must be removed and replaced. For <br /> reference 40 CFR part 280 Subpart B Section 280.20 overfill <br /> valves should be set to a maximum of 95%. <br /> 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.