My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2024
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
420
>
2300 - Underground Storage Tank Program
>
PR0231906
>
COMPLIANCE INFO_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2026 8:34:14 PM
Creation date
1/19/2024 11:19:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2024
RECORD_ID
PR0231906
PE
2361 - UST FACILITY
FACILITY_ID
FA0003776
FACILITY_NAME
KWIK SERV LODI BW 113*
STREET_NUMBER
420
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06202042
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
420 W KETTLEMAN LN LODI 95240
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3,208 <br />-"Secondary Containment Testing Date is incorrect, the date is 01/15/2021" <br />Secondary containment testing was preformed on 01/15/2021. On page 6 of the secondary containment <br />testing report the technician stated "Need to return to replace DSL boot in 5/6 and E85 boot. Need to <br />test E85 STP and sec line, DSL sec line, UDC's 5/6, 7/8 and 9/10" <br />Repairs and testing happened on 2/18/2021 (The date that I have on my DO reports) Page 4 section 10 of <br />the DO report "Has secondary containment testing been COMPLETED within the past 36 months?" <br />I will put the date of 01/15/2021 on my reports because the county wants that date, but it is not the <br />COMPLETION date of the testing. <br />
The URL can be used to link to this page
Your browser does not support the video tag.