Laserfiche WebLink
<rmarty@advgeoenv.com>; Djuth, Gerald@Waterboards rGerald.Diuth@waterboards.ca.goy> <br />Subject: RE: Pilkington - 500 E Louise Ave, Lathrop- WU1 excavation and removal <br />Hi Brian, <br />Thursday 3/28 is better for us than Friday 3/29, however, we can accommodate either day for a site meeting. <br />Thanks, <br />Ann M. Palmer <br />Water Resource Control Engineer <br />Site Cleanup Section <br />(916) 464-4825 <br />Ann. ('armer@water6oards. ca.Bov <br />Central Valley Water Board <br />11020 Sun Center Drive, Suite 200 <br />Rancho Cordova, CA. 95670 <br />From: Brian W. Millman <bmillman@advizeoenv.com> <br />Sent: Friday, March 22, 2019 3:41 PM <br />To: Palmer, Ann@Waterboards <Ann.Palmer@waterboards.ca.gov>; Robert McClellon [EH) <RMcCleilon@sicehd.com; <br />Linda Turkatte (Iturkatte@sicehd.com) <Iturkatte@sicehd.com> <br />Cc: 'Dana Parry' <danap@reynoldsandbrown.com>; Joe Brusca ribrusca@bruscaassociates.com>; Robert Marty <br /><rm a rty @ a dvgeoe nv. co m > <br />Subject: Pilkington - 500 E Louise Ave, Lathrop- WU1 excavation and removal <br />Hello Ann and Linda, <br />Soil excavation and removal of wastes from WU1 at 500 East Louise Avenue, Lathrop began on <br />Monday 18 March 2019. Field activities to remove the soil cap and glass cullet beneath the cap were <br />performed between 18 and 21 March 2019. Work was postponed today due to complications with the <br />excavating equipment. Work will resume on Monday 25 March 2019 and the job will likely be <br />completed by Tuesday 26 March 2019. 1 would like to schedule a meeting at the site on Thursday <br />(3128) or Friday (3129) next week with both agencies to inspect the work performed. Would the EHD <br />and CVRWQCB be amenable to a site meeting on either of those days? <br />Please don't hesitate to contact me with any questions or comments. <br />Thanks, <br />