My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2024
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3940
>
2300 - Underground Storage Tank Program
>
PR0507837
>
COMPLIANCE INFO_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2024 11:32:29 AM
Creation date
1/23/2024 1:06:26 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2024
RECORD_ID
PR0507837
PE
2361 - UST FACILITY
FACILITY_ID
FA0008057
FACILITY_NAME
H&S ENERGY PRODUCTS, LLC 3084
STREET_NUMBER
3940
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95304
APN
21220004
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
3940 N TRACY BLVD TRACY 95304
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 6. TANK SECONDARY CONTAINMENT TEST <br /> Test Method Developed by 0 Manufacturer C✓ Industry Standard C Professional Engineer <br /> Test Type 0 Pressurex❑ Vacuum ❑I— Hydrostatic <br /> Test Equipment Used: vacuum Gages <br /> Tank ID Gasoline -87/91 Diesel East Diesel West <br /> Tank Manufacturer Modern (Steel) Modern (Steel) Modern (Steel) <br /> Tank Capacity 20,000 20,000 20,000 <br /> Test Start Time 9:45 9:45 9:45 <br /> Initial Reading 7 7 7 <br /> Test End Time 11:45 11:45 11:45 <br /> Final Reading 7 7 7 <br /> Change in Reading 0 0 0 <br /> Pass/Fail Criteria 0 0 0 <br /> Tightness Test Results 0✓ Pass 0 Fail ® Pass C Fail ® Pass 0 Fail ❑ Pass C Fail <br /> 7. PIPE SECONDARY CONTAINMENT TEST <br /> Test Method Developed by El Manufacturer 0 Industry Standard © Professional Engineer <br /> Test Type © Pressure 0 Vacuum C Hydrostatic <br /> Test Equipment Used: Pressure Gages <br /> Pipe Run ID Gasoline-87 Gasoline -91 Diesel Retail Diesel Siphon <br /> Pipe Manufacturer Smith Smith Smith Smith <br /> Test Start Time 9:45 9:45 10:20 10:20 <br /> Initial Reading 5 5 5 5 <br /> Test End Time 10:45 10:45 11:20 11:20 <br /> Final Reading 5 5 5 5 <br /> Change in Reading 0 0 0 0 <br /> Pass/Fail Criteria 0 0 0 0 <br /> Tightness Test Results M Pass C Fail E Pass C Fail Pass IC Fail ❑x Pass C Fail <br /> Pipe Run ID Diesel East Diesel West <br /> Pipe Manufacturer Smith Smith <br /> Test Start Time 10:20 10:20 <br /> Initial Reading 5 5 <br /> Test End Time 11:20 11:20 <br /> Final Reading 5 5 <br /> Change in Reading 0 0 <br /> Pass/Fail Criteria 0 0 <br /> Tightness Test Results 0✓ Pass C Fail (✓ Pass C Fail I 0 Pass C Fail ED Pass 0 Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 2 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.