Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 6. TANK SECONDARY CONTAINMENT TEST <br /> Test Method Developed by E] Manufacturer 0✓ Industry Standard © Professional Engineer <br /> Test Type C Pressure F] Vacuum ❑Q Hydrostatic <br /> Test Equipment Used: 2 Inch Isolation ball with vacuum gauge <br /> Tank ID 87/91 Gasoline Diesel West <br /> Tank Manufacturer Trusco Trusco <br /> Tank Capacity 20K 20K <br /> Test Start Time 09:55 09:35 <br /> Initial Reading -10 Hg -10 Hg <br /> Test End Time 11:55 11:35 <br /> Final Reading -10 Hg -10 Hg <br /> Change in Reading 0 0 <br /> Pass/Fail Criteria +/-0 +/-0 <br /> Tightness Test Results I 0✓ Pass 0 Fail ® Pass E Fail 0 Pass Ej Fail © Pass 0 Fail <br /> 7. PIPE SECONDARY CONTAINMENT TEST <br /> Test Method Developed by Manufacturer 0 Industry Standard © Professional Engineer <br /> Test Type © Pressure 0 Vacuum © Hydrostatic <br /> Test Equipment Used: <br /> Pipe Run ID <br /> Pipe Manufacturer <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pass/Fail Criteria <br /> Tightness Test Results Pass Fail Pass 0 Fail 10 Pass ID Fail 0 Pass 0 Fail <br /> Pipe Run ID <br /> Pipe Manufacturer <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pass/Fail Criteria <br /> Tightness Test Results 0 Pass [0 Fail 0 Pass r] Fail I 0 Pass [C] Fail C Pass 0 Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 2 of 5 <br />