Laserfiche WebLink
='°P�-J SAN �JOAQUIN Environmental Health Department <br /> Q; , <br /> " ' ` COUNTY Jasjit Kang , REHS , Director <br /> cgt , P Greatness grows here . Muniappa Naidu, REHS , Assistant Director <br /> PROGRAM COORDINATORS <br /> Jeff Carruesco , REHS , RDI <br /> Willy Ng , REHS <br /> Steven Shih , REHS <br /> Elena Manzo , REHS <br /> Natalia Subbotnikova , REHS <br /> October 7 , 2024 <br /> STEPHANIE CHARISSA <br /> WALTON ENGINEERING INC <br /> P . O BOX 1025 <br /> WEST SACRAMENTO , CA 95691 <br /> Stephanie . c@waltonengineering . com <br /> UST RETROFIT — FULL PERMIT APPROVAL <br /> Re : H &S ENERGY #3084 SR2400526 <br /> 3940 N . TRACY BLVD , TRACY , CA 95304 <br /> The San Joaquin County Environmental Health Department ( EHD ) has completed the review of the <br /> application for a permit to do the following on the underground storage tank ( UST) system at the above <br /> noted address : <br /> • Replace all low voltage wire at the tank area with Veeder root wire . <br /> • Install new OPW manways and junction box . <br /> • Install sumps penetration fittings and conduits . <br /> The permit has been approved with the following conditions : <br /> 1 . Contact the local fire district , the San Joaquin Valley Air Pollution Control District , and the local <br /> community development department for any applicable permits and requirements . <br /> 2 . Any changes in information and scope of work must be submitted to EHD for written approval <br /> prior to commencing work . All new submittals supersede previous ones . <br /> 3 . Email notification to ust(a�sjgov . orq to arrange the following inspection appointments . <br /> All appointments must be scheduled at least 48 hours in advance . Be aware that <br /> inspections for emergency work must be scheduled within five days of permit approval . <br /> a . Sensor functionality : Functionality of the monitoring system must be verified to ensure <br /> that monitoring has been restored to meet the requirements of Title 23 California Code <br /> of Regulations and the Health & Safety Code <br /> b . The secondary containment test of all the tanks and turbine sumps must be performed <br /> in accordance with the manufacturers ' guidelines . <br /> The facility cannot receive fuel in all tanks prior to EHD inspection and approval. <br /> 4 . Since concrete will be broken near the tanks Secondary Containment testing for the tanks and <br /> STP sumps is required six months after installation . Provide 48 hours notification to the EHD <br /> when this test is scheduled . <br /> 1868 E . Hazelton Avenue I Stockton , California 95205 T 209 468 - 3420 F 209 464- 0138 1 www . sjgov . org/ehd <br />