Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 8. SUMP/UDC TEST <br /> Test Method Developed by © Manufacturer Q Industry Standard El Professional Engineer <br /> Test Type © Pressure Q Vacuum E Hydrostatic <br /> Test Equipment Used: INCON -STS Operations- Level 4 <br /> Sump/UDC ID UDC#14-15A UDC#15-16 Diesel AST Sump <br /> Sump Manufacturer Bravo (Steel) Bravo (Steel) Bravo(FRP) <br /> Sump Depth (inches) 9 9 20 <br /> Sump Bottom to Top of Bottom Bottom 13 <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time 12:07 12:07 12:36 <br /> Initial Reading 0.2214 0.7381 2.233 <br /> Test End Time 12:22 12:22 12:51 <br /> Final Reading 0.2217 0.7383 2.233 <br /> Change in Reading 0.0003 0.0002 0.000 <br /> Pass Fail Criteria +/-0.002 +/-0.002 +/- 0.002 +/- 0.002 <br /> Tightness Test Results El Pass rl Fail © Pass rl Fail © Pass © Fail [7 Pass El Fail <br /> Sump/UDC ID <br /> Sump Manufacturer <br /> Sump Depth (inches) <br /> Sump Bottom to Top of <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pass Fail Criteria +/-0.002 +/-0.002 +/- 0.002 +/- 0.002 <br /> Tightness Test Results 0 Pass 0 Fail 0 Pass 0 Fail © Pass © Fail M Pass Ll Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 3of5 <br />