Laserfiche WebLink
We received an NTC due to not pulling a permit to replace a LIKE-for-LIKE STP 91 sensor, please see <br /> approved permit application with all the fees paid off as well. What kind of inspection are you guys <br /> looking for?We would like to clear this up as soon as possible. The next steps for us are the following: <br /> 1. Consider this as your 48hr notice for the sensor replacement done back in June 2023 <br /> 2. The sensor was tested back in the November 2023 during the routine monitoring certification <br /> process <br /> - Would you guys accepted that days testing as good enough to clear this NTC <br /> 3. If that is not the case what type of inspection are you guys looking for, so we can clear this? <br /> Best Regards, <br /> Anthony Romero <br /> Renewables Engineering Division <br /> Wayne Perry, Inc. <br /> 30 Main Ave. Suite 5 Sacramento, CA 95838 <br /> Cell: (916) 764-4472 <br />