My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2024
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LATHROP
>
140
>
2300 - Underground Storage Tank Program
>
PR0505687
>
COMPLIANCE INFO_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/2/2025 10:57:39 AM
Creation date
1/24/2024 2:27:46 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2024
RECORD_ID
PR0505687
PE
2361 - UST FACILITY
FACILITY_ID
FA0006943
FACILITY_NAME
LATHROP GAS & FOOD INC
STREET_NUMBER
140
Direction
E
STREET_NAME
LATHROP
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19611007
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\lsauers1
Supplemental fields
Site Address
140 E LATHROP RD LATHROP 95330
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SANJOAQUIN Environmental Health Department <br /> N ....�r <br /> RETURN TO COMPLIANCE CERTIFICATION <br /> AnyII INOR violations noted in the"Notice to Comply„in the attached Inspection Report must be corrected within 30 days of <br /> receipt of this inspection. This certification form must be submitted to the Environmental Health Department(EHD)address at <br /> the bottom of this form within 30 days of receipt of the Inspection Report. HSC 25404.1.2(c)(1) <br /> All corrections to other violations noted in the attached Inspection Report(IR)or Continuation Form,or disputes to any <br /> violations,are to be submitted using this certification and returned to EHD within 30 days unless otherwise specified in the <br /> Inspection Report, HSC 25185(c)(3) <br /> Note: All EHD staff time associated with falling to comply by the above noted dates will be billed <br /> at the current hourly rate. <br /> For this certification to be complete, the operator of the site must include. <br /> A statement documenting what corrective actions were taken or will be taken for each violation <br /> Copies of sample results/manifests/training records/other appropriate paperwork,and/or photos verifying corrections <br /> Operator's certification <br /> Inspection Date: December 14, 2023 Inspected By: KRISTINA SAETERN <br /> Facility Address. 140 E LATHROP RD, LATHROP CERS ID: 10182153 <br /> 1 certify under penalty of law that: <br /> 1. 1 have corrected the violations specified in the Inspection Report from the above-mentioned inspection date. <br /> 2. 1 have personally examined the following documentation submitted as proof of compliance FOR EACH VIOLATION <br /> and I believe the information to be true,accurate, and complete: <br /> Photos—Paperwork--k—Statement <br /> 3. 1 am authorized to submit this certification on behalf of the Respondent. <br /> 4. 1 am aware that there are significant penalties for submitting false information, including the possibility of a fine <br /> and/or imprisonment for known violations. (HSC 25191) <br /> Name: f-�) �f ��� Title: 1�r <br /> r <br /> Signature: Date: <br />
The URL can be used to link to this page
Your browser does not support the video tag.