Laserfiche WebLink
kkk.The trash enclosure should have a concrete area for truck turning and pickup. Also, it should <br /> comply with SB-1383 requirement. <br /> III. All ADA ramps and access should have the detectable surface. (note says they should not). <br /> mmm. The minimum height of signs in circulation areas should be 7 feet above finished surface. <br /> nnn. Tubular steel fencing shall be in compliance with MHCSD Standards and MHCSD Design <br /> Manual. <br /> 000. The improvement design for Landscape strips on three sides shall be submitted to MHCSD for <br /> review and approval. <br /> ppp. The owner shall repair damages to sidewalks, curb and gutter, and pavements caused by the <br /> construction traffic near the project site. <br /> qqq. All driveways shall meet the MHCSD Standard Specifications and Detail SC-11 (Type 2 <br /> Commercial Driveway). <br /> rrr. The plans for the Point of Connections to MHCSD utilities (Sewer, Water and Stormwater) shall <br /> be reviewed and approved by MHCSD. <br /> sss. A masonry wall shall be constructed per MHCSD Standards between the Commercial <br /> development and the residential properties. <br /> ttt. All improvements withing MHCSD right of way shall be reviewed and approved by MHCSD. <br /> uuu. The owner shall sign and execute an agreement for MS4 compliance with MHCSD (Stormwater <br /> Maintenance Agreement). <br /> vvv. Install stormwater treatment system (BMP's)to provide comprehensive onsite stormwater <br /> filtering/treatment and trash capturing system. <br /> www. All onsite facilities and utility improvements to be privately maintained in accordance to MHCSD <br /> and State Requirements. <br /> Notes and Information Only: <br /> See SJCOG letter dated January 25, 2024. The neighborhood commercial project(PA-2300281) is subject to <br /> the SJMSCP. The project site has paid the HCP mitigation fees at the time the existing parcel was created <br /> though the Final Map process and therefore additional HCP fees are not due. Please contact SJMSCP staff <br /> regarding completing the following steps to satisfy SJMSCP requirements: Schedule a SJMSCP Biologist to <br /> perform a pre-construction survey prior to any ground disturbance. <br /> See PG&E letters dated January 25, 2024, and February 25, 2024. <br /> See San Joaquin Valley Air Pollution Control District letter dated February 14, 2024. <br /> See undated plan review comments from French Camp McKinley Fire Protection District. <br /> PA-2300280 and PA-2300281 —Conditions 13 <br />