Laserfiche WebLink
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 7. LINE LEAK DETECTOR TESTING <br /> ❑ Check this box if line leak detectors ARE NOT installed. (Do not complete this section.) <br /> Simulated release rate verified: (Check all: that apply.) Yes No NA <br /> A 3 GPH ❑ 0.1 GPH ❑ 0.2 GPH <br /> Has the testing apparatus been properly calibrated? A ❑ ❑ <br /> For emergency generator tank systems, does the LLD create an audible and visual ❑ ❑ <br /> alarm when a leak is detected? <br /> For mechanical LLDs, does the LLD restrict the flaw through the pipe when a ❑ ❑ <br /> release is detected? <br /> For electronic LLDs, does the turbine automatically shut off when a release is ® ❑ ❑ <br /> detected? <br /> For electronic LLDs, does the turbine automatically shut off if any portion of the ❑ ❑ <br /> monitoring system is disabled or disconnected? <br /> For electronic LLDs, does the turbine automatically shut off if any portion of the 21 ❑ ❑ <br /> mon itorirg system malfunctions or fails a tightness test? <br /> For electronic LLDs, have all accessible wiring connections been visually inspected ❑ ❑ ❑ <br /> for kinks and breaks? <br /> Were all items an the equipment manufacturer's maintenance checklist completed? �Zl ❑ ❑ <br /> Were all LLDs confirmed operational within regulatory requirements? � � ❑ <br /> LLD ID LLD Model Lines Monitored Pass Fail <br /> Q1 848480-001 91 RI ❑ <br /> Q2 848480-001 87 0 ❑ <br /> ❑ ❑ <br /> ❑ Q <br /> ❑ ❑ <br /> ❑ ❑ <br /> ❑ LA <br /> ❑ ❑ <br /> ❑ ❑ <br /> ❑ ❑ <br /> ❑ ❑ <br /> Describe all answers marked "No"or"Fail'and proposer!remedy in Section 9. <br /> List all monitoring equipment either replaced or repaired irr Section 9 <br /> Page 4 of 6 <br />