My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2024
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COLONY
>
1442
>
2300 - Underground Storage Tank Program
>
PR0518458
>
COMPLIANCE INFO_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2024 12:59:03 PM
Creation date
1/24/2024 4:29:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2024
RECORD_ID
PR0518458
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0013918
FACILITY_NAME
CHEVRON STATION #210997*
STREET_NUMBER
1442
STREET_NAME
COLONY
STREET_TYPE
DR
City
RIPON
Zip
95366
APN
26102028
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\lsauers1
Supplemental fields
Site Address
1442 Colony DR RIPON 95366
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Spill Container Testing Report Form <br /> 6. SPILL CONTAINER DETAILS <br /> Test Method Developed by ❑ Manufacturer 0 Industry Standard ❑ Professional Engineer <br /> Test Type Ll Pressure 0 Vacuum LJ Hydrostatic <br /> Tank ID T1 91 T2 87 <br /> Spill Container Manufacturer. oPW oPW <br /> Method of Cathodic Protection 0 Nonmeta;lic 0 Nonmetallic ❑ Nonmetallic ❑ nonmetallic <br /> ❑ Other ❑ Other ❑ Other El Other <br /> Is the spill container minimum 0 Yes 0 Yes ❑ Yes ❑ Yes <br /> capacity five gallons excluding ❑ No* ❑ Ido* ❑ No* ❑ iso* <br /> riser volume? <br /> R1 Drain R1 Drain ❑ Drain D Drain <br /> Method to keep spill container ❑ Pump ❑ Pump ❑ Pump LJ Pump <br /> empty ❑ Other ❑ Other ❑ Other ❑ Other <br /> Spill Container Test Results ❑ Pass ❑ Pass ❑ Pass ❑ Pass <br /> ❑ Fail I ❑ Fail I ❑ Fail L❑ Fail <br /> Tank la <br /> Spill Container Manufacturer- <br /> Method E) Nonmetallic El Nonmetallic El Nonmetallic <br /> Met#�od of Cathodic Protection ❑ Other ❑ Other ❑ Other Ll Other <br /> Is the spill container minimum ❑ Yes ❑ Yes ❑ Yes ❑ Yes <br /> capacity five gallons excluding ❑ No* ❑ No* ❑ Ido* ❑ No* <br /> riser volume? <br /> ❑ Drain ❑ Drain ❑ Drain ❑ Drain <br /> Method to keep spill container ❑ pump ❑ Pump ❑ Pump ❑ Pump <br /> empty ❑ Other ❑ Other ❑ Other ❑ Other <br /> Spill Container Test Results ❑ Pass ❑ Pass ❑ Pass ❑ Pass <br /> Q Fail ❑ Fail ❑ Fail ❑ Fail <br /> 8. COMMENTS <br /> Describe all answers marked '`Other.""No "or"Fail'and each proposed remedy. <br /> *Mark here if: <br /> ❑ Spill containers do not have a minimum capacity of five galions and require replacement. <br /> Additional copies of this page maybe attached. <br /> Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.