My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2024
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COLONY
>
1442
>
2300 - Underground Storage Tank Program
>
PR0518458
>
COMPLIANCE INFO_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2024 12:59:03 PM
Creation date
1/24/2024 4:29:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2024
RECORD_ID
PR0518458
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0013918
FACILITY_NAME
CHEVRON STATION #210997*
STREET_NUMBER
1442
STREET_NAME
COLONY
STREET_TYPE
DR
City
RIPON
Zip
95366
APN
26102028
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\lsauers1
Supplemental fields
Site Address
1442 Colony DR RIPON 95366
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chevron Monitoring Certification Checklist <br /> Store Number: 210997 Address: 1442A W COLONY DR.RIPON,CA 95366 <br /> Date:1/4/2024 Technician: Landon Zamora Company:TANKNOLOGY INC. <br /> Step Instruction T1:SUPREME T2:REGULAR <br /> UNLEADED UNLEADED <br /> Product PREMIUM REGULAR <br /> Tank Type Fiberglass Fiberglass <br /> (DW FRP,DW Steel,SW FRP) <br /> 1 Annular Riser Height(measured) 62.00 in. 62.00 in. <br /> Tank Diameter:(from tank chart, <br /> 2 0.00 in. 0.00 in. <br /> for example:118.375",117.75",111';92",etc.) <br /> 3 For FRP tanks,1/2 circumference of the tank 0.00 in. 0.00 in. <br /> (0.5 X3.14 X tank diam.)OR(q.57 x step 2) <br /> Required annular sensor length: <br /> 4 FRP=Riser+1/2 Circumference=step 1+step 3 62.00 in. 62.00 in. <br /> Steel=Riser+diameter=step 1+step 2 <br /> Mark&label the required sensor length on <br /> 5 sensor cord.Label should be under the cap& Yes Yes <br /> serve to prevent the cord being pulled too short. <br /> Is tank annular sensor in the correct position? <br /> Yes Yes <br /> 6 FRPTanks:with the marked required length <br /> lining up with the top of the annular riser? Yes Yes <br /> Steel Tanks:sensor touching bottom with slack <br /> above the marked required sensor length? <br /> Are the DW pipe boots pulled back in tank sumps? <br /> 8 (YIN or N/A,note if can't be verified because Yes Yes <br /> clamshell pointing down) <br /> Are tank sump sensors back in their holders and <br /> 9 in the correct position? Yes Yes <br /> (YIN or N/A document with photo) <br /> 7 Approximate gallons of product dispensed for <br /> purging,etc.and returned to tank <br /> Has the Veeder Root Battery been replaced&dated prior to failsafe? <br /> (If battery backup failed,label and leave failed battery on top of console,note in comments and advise your OM) See Comment <br /> Has Veeder Root Programming before&after testing been printed&verified? Yes <br /> (especially tank manifolding setup-see Note 2) <br /> Has Veeder Root Programming before&after been attached to the Work Order? Yes <br /> Have all sensor model numbers been verified against the Veeder Root cord label? Yes <br /> Make a note if sensor label missing or illegible,&approx.cord length for-208/-209 with missing labels <br /> Additional Comments: <br /> BATTERY STILL IN GOOD CONDITION. <br /> Note 1: Certain Veeder Root Software versions will automatically revert to the default tank manifold settings anytime the programming is changed,such as when sensors are <br /> temporarily X'ed out,etc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.