My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2024
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COLONY
>
1442
>
2300 - Underground Storage Tank Program
>
PR0518458
>
COMPLIANCE INFO_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2024 12:59:03 PM
Creation date
1/24/2024 4:29:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2024
RECORD_ID
PR0518458
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0013918
FACILITY_NAME
CHEVRON STATION #210997*
STREET_NUMBER
1442
STREET_NAME
COLONY
STREET_TYPE
DR
City
RIPON
Zip
95366
APN
26102028
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\lsauers1
Supplemental fields
Site Address
1442 Colony DR RIPON 95366
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 5. MONITORING SYSTEM AND PROGRAMMING <br /> A separate Monitoring System Certification Form must be prepared for each control panel. <br /> Make of Monitoring System Model of Monitoring System Software Version Installed <br /> Control Panel Control Panel <br /> Veeder Root TLS-350 335.00 <br /> Attach the post-certification reports if the monitoring system is capable of generating fifes No NA <br /> either, Monitoring System Set-up 0 Alarm History Report <br /> All monitoring equipment is operational per manufacturer's specifications? R) Ll <br /> Secondary containment systems are free of damage, debris, or liquid? R) Ll <br /> Are the audible and visual alarms operational? R1 A <br /> All sensors have been: 1) visually inspected for wiring kinks, breaks and residual <br /> buildup on floats; and 2) tested for functionality and confirmed operational? <br /> Are all sensors installed to detect a release at the earliest opportunity in the 0 J J <br /> secondary containment? <br /> The monitoring system set-up was reviewed, and proper settings confirmed? <br /> Was the monitoring control panel's backup battery visually inspected, functionally R) J L) <br /> tested; and confirmed operational? <br /> Does the flow of fuel stop at the dispenser if a release is detected in the under- R) J L) <br /> dispenser containment? <br /> Does the turbine automatically shut down if the piping secondary containment <br /> monitoring system fails to operate or is electrically disconnected? <br /> Does the turbine automatically shut down if the piping secondary containment <br /> monitoring system detects a release? Which sensors initiate positive shut down? R11 Ll Ll <br /> (Check all that apply) Z Sump 0 UDC <br /> If monitoring system alarms are relayed to a remote monitoring center, is all A Ll Ll <br /> communication equipment operational? <br /> Describe alf answers marked "No"or"Fail'and proposed remedy in Section 9. <br /> List all monitoring equipment either replaced or repaired in Section 9 <br /> Page 2 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.