My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2024
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
1151
>
2300 - Underground Storage Tank Program
>
PR0231429
>
COMPLIANCE INFO_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2024 1:27:55 PM
Creation date
1/31/2024 9:03:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2024
RECORD_ID
PR0231429
PE
2361 - UST FACILITY
FACILITY_ID
FA0000819
FACILITY_NAME
ONE STOP MARKET*
STREET_NUMBER
1151
Direction
W
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
21641001
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
1151 W LOUISE AVE MANTECA 95336
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The following is an itemized list of underground storage tank violations that have not <br /> been addressed for ONE STOP MARKET* as of January 26, 2024. <br /> Open violations from December 11, 2023 inspection <br /> Violation#115-Failure to submit"Monitoring System Certification Form"within 30 days of completion of <br /> the test. <br /> OBSERVATION:Annual monitoring system certification and leak detector testing was performed on 12/8/2022 and <br /> a test report was submitted on 4/5/2023, 118 days late. <br /> REGULATION GUIDANCE:A copy of the test report must be submitted within 30 days of the tests. <br /> CORRECTIVE ACTION: Take all necessary precautions to ensure testing and submittal of test reports are <br /> performed in a timely manner. <br /> ❑ This violation was corrected ❑This violation will be corrected by(date): <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation: <br /> Violation#116-Failure to submit the"Spill Container Testing Report Form"within 30 days. <br /> OBSERVATION:Annual spill container testing was performed on 12/8/2022 and a test report was submitted on <br /> 4/5/2023, 118 days late. <br /> REGULATION GUIDANCE:A copy of the test report must be submitted within 30 days of the tests. <br /> CORRECTIVE ACTION: Take all necessary precautions to ensure testing and submittal of test reports are <br /> performed in a timely manner. <br /> ❑ This violation was corrected ❑This violation will be corrected by(date): <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation: <br /> Violation#122-Failure to implement corrections and submit written response within 30 days of receiving <br /> the report. <br /> OBSERVATION:An inspection was last done on 12/8/2022 and an inspection report was issued identifying <br /> information to be submitted to bring this site into compliance. This information was required to be submitted by <br /> 1/7/2023. This information was received on 4/26/2023, 109 days late. <br /> REGULATION GUIDANCE:An operator that receives an inspection report shall have 30 days to implement the <br /> corrections specified in the inspection report and comply with permit conditions. The corrective action shall include <br /> all of the recommendations made in the report. The operator shall submit a written response that includes a <br /> statement documenting corrective actions taken or proposing corrective actions which will be taken. <br /> CORRECTIVE ACTION: Ensure that a written response documenting corrective actions taken or proposed is <br /> submitted and all corrections implemented within 30 days of receiving an inspection report. <br /> Page 1 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.