Laserfiche WebLink
Underground Storage Tank <br />Monitoring System Certification Form <br />10. MONITORING SITE PLAN <br />Date site plan was prepared: 12/14/2023 <br />If a site plan has been prepared that shows all required information, you may include it, rather than this page, <br />with your Monitoring System Certification Form. The site plan must show the general layout of tanks and <br />identify locations of the monitoring panel, and all leak detection equipment and monitoring locations. Include <br />a legend for all symbols depicted. <br />8<ie Addre==-s C —1y 3AS & LICUCR 1d470 CAMHRiCGE Rd Lk?HCP. CA <br />xPIPLNG <br />Dra%mE of piping <br />-it of sump and <br />LTC-, E. �co <br />tmderprouud <br />dM'vmg i <br />accurate, Tve <br />cannot specuiata <br />Nue pnntz_ <br />Ar�-ife7rY: rr7ri�o uaxilhd dYe7ed 575r�J'8 rQ 1}�CPl7[iTHg YeCld47QArP A"e'Q <br />Fras:ilQfifdareox nrefmasols{� J6r i7�6ur�ralrorexlprrxpxas. Drmrirg <br />M1 fQ side <br />date map was dravin: 12+22+241 <br />Instructions <br />KEY <br />.oi=3Y'�'LZ.iti Seosar <br />F = FILLS <br />V=VAPOR <br />P=PRQBE <br />L = Turbm,-'LeakDetector <br />X= SLAP SENSOR <br />S =Brine Seosar <br />5 = Smart Smaor <br />C =Fleets a& cl i. <br />F = E Stop <br />If you already have a diagrwn that shows al required infarmatian. you may include it, rather Shan this page, with your Monitoring System Certification. On your--& plan, <br />shawttee generA layout of tanks and piping. Clearly idenfdy loeatiGns ol1hefcllowing equi_oment, if installed: mon�riing system control panels; sansors manitorirrg tank <br />annular spaces, sumps, dispenser pans, spill mf"ners, or other secondary conlainnneit areas: mechanical or ete'dronic line leak detedors; and in -tank liquid levet <br />probes t'rf used for kik dmection). In the space provided, note the date this Site Plan was prepared. <br />Page 6 of 6 <br />