My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2024
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
2701
>
2300 - Underground Storage Tank Program
>
PR0231176
>
COMPLIANCE INFO_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2026 7:36:42 PM
Creation date
1/31/2024 1:35:26 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2024
RECORD_ID
PR0231176
PE
2361 - UST FACILITY
FACILITY_ID
FA0003798
FACILITY_NAME
MARCH LANE 76*
STREET_NUMBER
2701
Direction
W
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95219
APN
11619007
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
2701 W MARCH LN STOCKTON 95219
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Overfill Prevention Equipment Inspection Report <br /> 6. OVERFILL PREVENTION EQUIPMENT DETAILS <br /> Tank ID (one OPE per column) T1: REGULAR T2: PREMIUM T3: DIESEL <br /> Are both vent and tank riser piping ❑Yes ❑Yes ❑Yes ❑Yes <br /> secondarily contained? ❑✓ No ❑✓ No ❑✓ No ❑ No <br /> OPE Model OPW 71SO OPW 71SO OPW 71SO <br /> What is the OPE response when activated? OShut off OShut off Shut off ❑Shut off <br /> (Check all that apply.) Flow Flow Flow Flow <br /> ❑Restricts ❑Restricts [—]Restricts ❑Restricts <br /> Flow Flow Flow Flow <br /> ❑Audible ❑Audible ❑Audible ❑Audible <br /> Alarm Alarm Alarm Alarm <br /> ❑Visual ❑Visual ❑Visual ❑Visual <br /> Alarm Alarm Alarm Alarm <br /> Are flow restrictors installed on vent piping ❑Yes* ❑Yes* ❑Yes* ❑Yes* <br /> that may interfere with the OPE operation? ❑✓ No ❑✓ No ✓❑No ❑ No <br /> At what level in the tank is the OPE set to <br /> activate? (Inches from bottom of tank) 97.50 98.00 75.75 <br /> What is the percent capacity of the tank at <br /> 92.73% 93.11% 84.90% <br /> which the OPE activates? <br /> Is the OPE in proper operating condition to ✓❑Yes Z Yes ❑✓ Yes ❑Yes <br /> respond when the stored substance ❑ No ❑ No ❑ No ❑ No <br /> reaches the designated regulatory level? <br /> 7. SUMMARY OF TESTING RESULTS <br /> OPE Inspection Results ✓❑ Pass ❑✓ Pass ❑✓ Pass ❑ Pass <br /> ❑ Fail ❑ Fail ❑ Fail ❑ Fail <br /> 8. COMMENTS <br /> Describe all results marked "Fail'and each proposed remedy. <br /> * Mark here if: <br /> ❑Flow restrictors interfere with overfill prevention and equipment repairs required. <br /> Additional copies of this page may be attached. <br /> Attach tank chart(s), measurements, calculations, and In-Tank Setup report(s) <br /> Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.