Laserfiche WebLink
Underground Storage Tank <br /> Designated UST Operator Visual Inspection Report <br /> 10. TESTING AND MAINTENANCE Yes No NA Date last <br /> performed <br /> Has monitoring system certification been completed within the past <br /> 1 m ❑ 12/12/2022 <br /> 2 months? <br /> Has spill container testing been completed within the past <br /> 12 months? m 11 12t1212022 <br /> Has overfill prevention equipment inspection been completed within m ❑ ❑ 1111212021 <br /> the past 36 months? <br /> Has secondary containment testing been completed within the past <br /> 36 months? m 1:1 El 11112812022 <br /> Has tank tightness testing been completed within required ❑ ❑ m <br /> timeframes? <br /> Has line tightness testing been completed within the required ❑ ❑ m <br /> timeframes? <br /> Other Test / Maintenance: ❑ ❑ ❑ <br /> Other Test / Maintenance: ❑ ❑ ❑ <br /> Other Test / Maintenance : ❑ ❑ ❑ <br /> 11 . FACILITY EMPLOYEE TRAINING Yes No <br /> Have all individuals performing facility employee duties received the required facility ❑ m <br /> employee training within the past 12 months? <br /> 13. COMMENTS <br /> This section may be used to record comments or observations that are not current compliance <br /> deficiencies. <br /> All answers marked "No" must be described by the designated UST operator in Section 3. <br /> Page 4 of 4 <br />