Laserfiche WebLink
Underground Storage Tank <br />Secondary Containment Testing Report Form <br />All tests marked “Fail” and any repairs made before or during the tightness test must be described in <br />the COMMENTS section. <br />Page 3 of 5 <br />Test Method Developed by Manufacturer Industry Standard Professional Engineer <br />Test Type Pressure Vacuum Hydrostatic <br />Test Equipment Used:F.F.S. Incon TS-STS / Triangle 5000w w/ + or – 0.002” graduations <br />Sump/UDC ID UDC #3-4 UDC DSL-Tran <br />Sump Manufacturer Bravo Bravo <br />Sump Depth (inches)8” 8” <br />Sump Bottom to Top of <br />Highest Pipe Penetration <br />(inches) <br />Piping enters <br />through the <br />bottom <br />Piping enters <br />through the <br />bottom <br /> <br />Test Start Time 1:23pm 1:55pm <br />Initial Reading 2.3262” 0.2869” <br />Test End Time 1:38pm 2:10pm <br />Final Reading 2.3265” 0.2871” <br />Change in Reading +0.0003” +0.0003” <br />Pass/Fail Criteria + or – 0.002” + or – 0.002” <br />Tightness Test Results Pass Fail Pass Fail Pass Fail Pass Fail <br />Sump/UDC ID <br />Sump Manufacturer <br />Sump Depth (inches) <br />Sump Bottom to Top of <br />Highest Pipe Penetration <br />(inches) <br /> <br />Test Start Time <br />Initial Reading <br />Test End Time <br />Final Reading <br />Change in Reading <br />Pass/Fail Criteria <br />Tightness Test Results Pass Fail Pass Fail Pass Fail Pass Fail <br />Additional copies of this page may be attached. <br />8. SUMP/UDC TEST