Laserfiche WebLink
SAN J OAQ U I N Environmental Health Department <br /> ul i COUNTY Jasjit Kang , REHS , Director <br /> 0 �iFon�' y' ' Muniappa Naidu , REHS , Assistant Director <br /> Ci reo t n e s s grows here . <br /> PROGRAM COORDINATORS <br /> Jeff Carruesco , REHS , RDI <br /> Willy Ng , REHS <br /> Steven Shih , REHS <br /> Elena Manzo , REHS <br /> Natalia Subbotnikova , REHS <br /> March 19 , 2024 <br /> Mike Eliason <br /> Valley Pacific Petroleum <br /> 152 Frank West Circle <br /> Stockton , CA 95206 <br /> Mike . eliason6 vpps . net <br /> Re : Valley Pacific Petroleum SR0087713 <br /> 1524 Fresno Ave , Stockton , CA 95206 <br /> The San Joaquin County Environmental Health Department ( EHD) has completed the review of the <br /> application for a permit to do the following on the underground storage tank ( UST) system at the above <br /> noted address : <br /> • Replace underground Flex Works flex piping between diesel turbine sump and dispenser 3-4 <br /> and 3-2 satellite . <br /> The permit has been approved with the following conditions : <br /> 1 . Contact the local fire district , the San Joaquin Valley Air Pollution Control District , and the local <br /> community development department for any applicable permits and requirements . <br /> 2 . Any changes in information and scope of work must be submitted to EHD for written approval <br /> rior to commencing work . All new submittals supersede previous ones . <br /> 3 . Email notification to ust6j sigov . org to arrange the following inspection appointments . <br /> All appointments must be scheduled at least 48 hours in advance . <br /> a . Verification of liquid and vapor tightness component installation ( shroud boots and band <br /> clamps for flex piping , appropriate rubber-type gasket or clamps ) <br /> b . Secondary containment testing on flex piping between the turbine sump and dispensers <br /> 3 -4 and 3 -2 satellite . <br /> c . If concrete is broken near the diesel tank , a secondary containment test must be <br /> performed on the diesel tank once concrete is poured in accordance with the <br /> manufacturer' s guidelines . <br /> 4 . Secondary containment testing for the flex piping between the turbine sump and dispensers 3-4 <br /> and 2 -3 satellite is required six months after installation . Provide 48 hours notification to the <br /> EHD when this test is scheduled . <br /> 5 . Any individual installing underground storage systems or components must possess , or work <br /> under the direct and personal supervision of an individual physically present at the work site at <br /> all times while work is being performed who possesses , all of the following : <br /> • One of several permissible valid , current contractor licenses issued by the Contractors <br /> State License Board ( CSLB ) <br /> 1868 E . Hazelton Avenue Stockton , California 952051 T 209 468-3420 1 F 209 464 -0138 1 www . sjgov . org/ehd <br />