Laserfiche WebLink
PA-2300293 (C), Early Consultation Re-referral, S00016022 Page 2 of 3 ' <br /> 9653 S. Manthey Road, French Camp, APN: 193-230-09 June 23, 2026 <br /> repair/replacement (area for 100% sewage disposal replacement). The plans shall include <br /> the design calculations, including the maximum number of persons the sewage disposal <br /> system is proposed to serve. In addition, show on revised plans that the disposal field area <br /> will be barricaded so it cannot be driven; over, parked on, or used as a storage area. This <br /> disposal field area must be used for that specific purpose only, and it cannot contain any <br /> underground utility lines. <br /> 5) Submit two (2) hardcopy sets, or one (1) electronic version, of food facility plans to the <br /> Environmental Health Department for review and approval prior to issuance of building <br /> permit(s) (California Retail Food Code, Article 1, 114380). The fee will be based on the <br /> current schedule at the time of payment. <br /> 6) A valid permit from EHD is required prior to operating food facility (California Retail Food <br /> Code, Chapter 13, Article 1, Section 14381). <br /> 7) Submit Water Provision Declaration form to the Environmental Health Department for <br /> review. If the EHD determines that the facility classifies as a Small Public Water System <br /> (SPWS), the applicant shall submit a Preliminary Technical Report to the California State <br /> Water Resources Control Board, Division of Drinking Water (Water Board) prior to issuance <br /> of building permits and at least six months before initiating construction of any water related <br /> improvement, as defined. The issuance of a permit to operate a small public water system <br /> by the local primacy agency, EHD, is prohibited without the concurrence of the Water Board. <br /> Please contact Gena Farley at Gena.Farley@waterboards.ca.gov or 209-948-7488 with the <br /> SWRCB Division of Drinking Water concerning the requirements for preliminary technical <br /> report submittal prior to issuance of building permits. <br /> 8) If the Water Board determines that the applicant has met the requirements of Senate Bill <br /> 1263 and Health and Safety Code section 11652, a permit application to operate Small <br /> Public Water System shall be submitted to the EHD for approval prior to issuance of building <br /> permits. To issue a permit to operate, concurrence from the Water Board is required. An <br /> annual permit to operate a public water system will be required by the Environmental Health <br /> Department prior to sign off of the certificate of final occupancy (San Joaquin County <br /> Development Title, Section 9-602.010 and 9-601.030). An onsite well shall meet public well <br /> standards to serve the potable water supply. Applicant shall contact Natalia Subbotnikova, <br /> Program Coordinator, Small Public Water System Program at (209) 468-0338 with any <br /> questions. <br /> 9) Construction of an individual domestic water well under permit and inspection by the <br /> Environmental Health Department is required at the time of development (San Joaquin <br /> County Development Title, Section 9-601.010 (b)). <br /> 10) Any existing wells or septic systems to be abandoned shall be destroyed under permit and <br /> inspection by the EHD (San Joaquin County Development Title, Section 9-605.010 & 9- <br /> 601.020). <br />