My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CALIFORNIA
>
730
>
1600 - Food Program
>
PR0548889
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2024 9:55:31 AM
Creation date
2/1/2024 9:55:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0548889
PE
1635
FACILITY_ID
FA0028024
FACILITY_NAME
TACOS REYES #4UA4363
STREET_NUMBER
730
Direction
S
STREET_NAME
CALIFORNIA
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14723003
CURRENT_STATUS
01
SITE_LOCATION
730 S CALIFORNIA ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\ymoreno
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.. <br />The EHD must be kept informed of the construction progress. A final inspection must be <br />performed, operating permit fees paid, and approval to operate granted prior to opening for <br />business. All equipment must be installed and thorough cleaning completed prior to the final <br />inspection. Inspections must be scheduled at least 48 hours in advance. Charges for additional <br />inspections, re-inspections and/or consultations may be assessed at the EHD hourly rate of $162 <br />per hour. <br />Any item(s) inadvertently overlooked in the plan check process, which is not in compliance with <br />applicable State laws, and/or city or county ordinance codes, shall be constructed or <br />reconstructed upon request of the EHD. Inferior workmanship, equipment, or materials will not be <br />accepted for the construction or operation of a food facility. Any variance from the requirements <br />outlined in this letter will require written approval from the EHD. Approval of the submitted plans <br />shall become null and void if the work authorized is not commenced within 180 days from the date <br />of approval, or the work authorized by such plans is abandoned. In order to renew action on an <br />expired plan approval, the applicant shall submit fees equal to that of a new plan review. A copy <br />of the approved plans shall be available on site at the time of final inspection. <br />If you have any questions, please contact Kadeanne Linhares, Senior Registered Environmental <br />Health Specialist, at (209) 616-3025. <br />Sincerely, <br />Jeff Carruesco, REHS, RDI <br />Program Coordinator <br />JCNP:kl
The URL can be used to link to this page
Your browser does not support the video tag.