Laserfiche WebLink
SAN J 0 A Q I I I Irl Environmental Health Department <br /> CCUN r <br /> Underground Storage Tank Program Inspection Report <br /> Facility Name: Facility Address: Date: <br /> STOCKTON FOOD&GAS#2 2057 S EL DORADO ST, STOCKTON February 13, 2024 <br /> SUMMARY OF VIOLATIONS <br /> (CLASS I,CLASS II,or MINOR-Notice to Comply) <br /> Item# Remarks <br /> 203 CCR 2712(b)(1-2)Failure to maintain monitoring records for 36 months and maintenance records for 60 months. <br /> OBSERVATION: Maintenance and monitoring records for the last three years were not found on site. <br /> -6/15/2021 Secondary Containment Testing <br /> REGULATION GUIDANCE: These records shall be maintained on site for at least three years. Monitoring records <br /> include: (1)date and time of all monitoring or sampling; (2)monitoring equipment calibration and maintenance <br /> records; (3)results of any visual observations; (4)results of sample analysis performed a lab or in the field; (5)logs <br /> of all readings of gauges or other monitoring equipment, ground water elevations, or other test results; (6)results of <br /> inventory readings and reconciliations. <br /> CORRECTIVE ACTION: Immediately locate and maintain all missing maintenance and monitoring records for the <br /> last three years on site. Submit copies of any missing work orders and alarm records to the EHD. <br /> This is a repeat violation, Class II. <br /> 208 CCR 2716(a-e) Failure to comply with the designated operator inspection requirements. <br /> OBSERVATION: The designated operator failed to check and note all required items on the visual inspection <br /> reports.The incorrect and missing information included the following from the inspection reports: <br /> -The owner/operator did not sign some reports. <br /> -The owner/operator did not response in section 5 in some of the reports. <br /> REGULATION GUIDANCE: During the visual inspection,the designated operator shall check that all required <br /> testing and maintenance for the UST system have been completed and shall check all required items on the report. <br /> CORRECTIVE ACTION: Ensure that designated operators performing visual inspections at this facility are including <br /> all of the required information on the reports. <br /> This is a repeat violation, Class II. <br /> 304 CCR 2631(a); HSC 25290.1(c) Failure to construct, operate, and maintain primary containment as product-tight. <br /> OBSERVATION: Per technician, Dave Winkler, approximately 6 inches of fuel was observed inside the 87 STP <br /> sump indicating a leak in the primary containment. <br /> REGULATION GUIDANCE:All primary containment for the UST system must be product tight. <br /> CORRECTIVE ACTION: Immediately have a properly licensed,trained, and certified contractor repair or replace the <br /> failed component(s), under permit and inspection of the EHD if necessary. <br /> This is a repeat violation, Class II. <br /> FA0003735 PR0231083 SCO01 02/13/2024 <br /> EHD 23-01 Rev.12/06/2021 Page 5 of 6 Underground Storage Tank Program OIR <br /> 1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjgov.org/EHD <br />