My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2024
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
2500
>
2300 - Underground Storage Tank Program
>
PR0232507
>
COMPLIANCE INFO_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2024 11:38:00 AM
Creation date
2/20/2024 2:24:34 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2024
RECORD_ID
PR0232507
PE
2361 - UST FACILITY
FACILITY_ID
FA0003846
FACILITY_NAME
Verizon Business: LDIKCA
STREET_NUMBER
2500
Direction
W
STREET_NAME
TURNER
STREET_TYPE
RD
City
Lodi
Zip
95242
APN
029-030-39
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\lsauers1
Supplemental fields
Site Address
2500 W Turner RD Lodi 95242
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Environmental Health Depart ent <br /> SANzoJOAQUIN <br /> � 7 a <br /> qrore5 here , <br /> RETURN TO COMPLIANCE CERTIFICATION <br /> Any MINOR violations noted in the "Notiva to CompIrin the attached inspection Report mush be corrected within 30_days of <br /> receipt of this inspection . This certification fans must be submitted to the Environmental Health Department ( EHD) address at <br /> the bottom of this form within 30 days of receipt of the Inspection Report. HSC 25404. 1 .2(c)( 1 ) <br /> ASI corrections to other violations noted in the attached Inspection Report (11R) or Continuation Form , or disputes to any <br /> violafions, are to be submitted using this certification and returned to EHD within 30 days unless otherwise specified in the <br /> Inspection Report. HSS 25185(c)(3) <br /> Note : All EHD staff time associated with failing to comply by the above noted dates will be billed <br /> at the current hourly rate. <br /> For th 'i's certl*fication to be complete , the operator of the site must include: <br /> • A statement documenting what collective actions were taken or will be taken for each violation <br /> • Copies of sample results/manifests/training recardslother appropriate paperwork, and/or photos verifying corrections <br /> • operator's certification <br /> Inspection Date : March 26 , 2024 Inspected By: KRISTINA SAETERN <br /> Facility Address : 2500 W Turner Rd , Lodi CERS [D: 10403278 <br /> certify under penally of law that <br /> 1 . I have corrected the violations specified in the Inspection Report from the above-mentioned inspection date. <br /> 2. 1 have personally examined the following docurnentaton submitted as proof of compliance FOR EACH VIOLATION <br /> and I believe the information to be true, accurate, and complete: .6 <br /> _,_,Photos Paperwork ... Statement <br /> 3. [ am authorized to submit this certification on behalf of the Respondent. <br /> 4 . I am aware that there are significant penalties for submitting false information , including the passibility of a fine <br /> and/or imprisonment for known violations. (HSC 25 'i } <br /> Name : Z>V- %,07 rTitle : <br /> or 0 00, <br /> Signature . - Date . <br /> Scanned with CamScanner <br />
The URL can be used to link to this page
Your browser does not support the video tag.