Laserfiche WebLink
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 10. MONITORING SITE PLAN <br /> Date site plan was prepared: <br /> If a site plan has been prepared that shows all required information, you may include it, rather than this page, <br /> with your Monitoring System Certification Form. The site plan must show the general layout of tanks and <br /> identify locations of the monitoring panel, and all leak detection equipment and monitoring locations. Include <br /> a legend for all symbols depicted. <br /> UST MONITORING SITE PLAN <br /> SAN JOAQUIN COUNTY PUBLIC WORKS CORP YARD <br /> 1810 HAZELTON, STOCKTON, CA 95203 <br /> DIE SLAVE DIE 87 VR TLS350 <br /> X-L4 X-L5 X-L3 ATG <br /> 208 zo8 208 <br /> PIPING PIPING <br /> DIE UNLEADED 87 <br /> X-L <br /> L-D L X-Li <br /> L8 <br /> BUILD/NO <br /> O �O <br /> A- <br /> A- <br /> 303 <br /> 303 <br /> PIPING <br /> CAS A-ANNULAR <br /> (HEALYI B- BRINE SENSOR <br /> C- FLOATS&CHAINS <br /> F- FILL <br /> L-MLLD/LEAK DETECTOR <br /> NI-MAN W AY <br /> P- PROBE <br /> S- STP <br /> T- TURBINE <br /> Date: 4/3/2024 V-VAPOR <br /> X-SUMPSENSOR <br /> 11M Th SC21c <br /> Page 6 of 6 <br />