Laserfiche WebLink
A gas-burning flare as wall as a pressure and vacuum relief valve ora installed on the AD <br /> lagoon to manage excess gas production; these are safety elements intended to protect <br /> worKers and equipment. <br /> A hydronic boiler and haat exchanger heat incoming manure in the hydrolyzar and maintain the <br /> temperature at '104"F.The heated manure slurry is pumped and circulated Through the AD <br /> lagoon using a recirculating jot mixing system. A second, smaller, heat exchanger is used to <br /> maintain a constant temperature within the AD lagoon. The heated digestata is pumped into and <br /> recirculated through the Jet mixing system to distribute the heat throughout the AD lagoon. <br /> Three CHPs will power the site. Natural Gas for the CH Ps/heating system will ba delivered via <br /> pipeline in the southwest corner of the site. The exact location is to be determined. Thera will be <br /> gas shutoff valves at each of the anginas and where the natural gas enters the site. <br /> The utility building will house the hydronic heating system, MCC and PLC/control room. Tha <br /> system described will operate independently but in coordination with the biogas up9rader. <br /> The site will have two full-lima-equivalent employees who will have access to office space in the <br /> office trailer. There will be 4 parking spaces plus 7van-accessible handicap space on the site <br /> near the office. Tha enclosed spaces on site rated for occupancy include only the office trailer. <br /> Security lighting will be placed throughout the site. Lights will be downward facing to prevent <br /> light pollution and protect the aesthetic of the facility. <br /> Project roads, turnaround areas, and parking areas will be all-weather surfaces. Two-way roads <br /> will be at least 40'wide. One-way roads will be at least 25' wide. <br /> The digester facility is separate from the axistin9 dairy and ranch operations. There will ba <br /> approximately f 5 truck trips of manure dally and 3 trips for the virtual RNG pipeline. Donor <br /> dairies and their addresses are given in Table 1 below.The attached site plan shows proposed <br /> trucking routes for manure deliveries. Those routes follow axistin9 routes that the dairies <br /> currently use to haul manure and compost. Therefore,the proposed trucking of dawatared <br /> manure will not have a significant impact on roads. <br /> Tha digester system will operate 24/7. Automated equipment eliminates the need for constant <br /> operation, although there will be personnel available in case of an emergency. One employee <br /> will be on-site during business hours between 8-5, Monday through Friday. <br /> This application package contains the following attachments: <br /> ATTACHMENT A: CUP Application <br /> ATTACHMENT B: CEQA Checklist <br /> ATTACHMENT C: Sita Plan <br /> ATTACHMENT D: Consolidated Emergency Response Plan <br />