My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0015706
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DODDS
>
23335
>
2600 - Land Use Program
>
PA-2300155
>
SU0015706
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2024 2:03:56 PM
Creation date
2/22/2024 9:49:16 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0015706
PE
2626 - USE PERMIT - GENERAL (UP)
STREET_NUMBER
23335
STREET_NAME
DODDS
STREET_TYPE
RD
City
ESCALON
Zip
95320
APN
20716004, 20735013
CURRENT_STATUS
Closed - Issued
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
23335 DODDS RD ESCALON 95320
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A gas-burning flare as wall as a pressure and vacuum relief valve ora installed on the AD <br /> lagoon to manage excess gas production; these are safety elements intended to protect <br /> worKers and equipment. <br /> A hydronic boiler and haat exchanger heat incoming manure in the hydrolyzar and maintain the <br /> temperature at '104"F.The heated manure slurry is pumped and circulated Through the AD <br /> lagoon using a recirculating jot mixing system. A second, smaller, heat exchanger is used to <br /> maintain a constant temperature within the AD lagoon. The heated digestata is pumped into and <br /> recirculated through the Jet mixing system to distribute the heat throughout the AD lagoon. <br /> Three CHPs will power the site. Natural Gas for the CH Ps/heating system will ba delivered via <br /> pipeline in the southwest corner of the site. The exact location is to be determined. Thera will be <br /> gas shutoff valves at each of the anginas and where the natural gas enters the site. <br /> The utility building will house the hydronic heating system, MCC and PLC/control room. Tha <br /> system described will operate independently but in coordination with the biogas up9rader. <br /> The site will have two full-lima-equivalent employees who will have access to office space in the <br /> office trailer. There will be 4 parking spaces plus 7van-accessible handicap space on the site <br /> near the office. Tha enclosed spaces on site rated for occupancy include only the office trailer. <br /> Security lighting will be placed throughout the site. Lights will be downward facing to prevent <br /> light pollution and protect the aesthetic of the facility. <br /> Project roads, turnaround areas, and parking areas will be all-weather surfaces. Two-way roads <br /> will be at least 40'wide. One-way roads will be at least 25' wide. <br /> The digester facility is separate from the axistin9 dairy and ranch operations. There will ba <br /> approximately f 5 truck trips of manure dally and 3 trips for the virtual RNG pipeline. Donor <br /> dairies and their addresses are given in Table 1 below.The attached site plan shows proposed <br /> trucking routes for manure deliveries. Those routes follow axistin9 routes that the dairies <br /> currently use to haul manure and compost. Therefore,the proposed trucking of dawatared <br /> manure will not have a significant impact on roads. <br /> Tha digester system will operate 24/7. Automated equipment eliminates the need for constant <br /> operation, although there will be personnel available in case of an emergency. One employee <br /> will be on-site during business hours between 8-5, Monday through Friday. <br /> This application package contains the following attachments: <br /> ATTACHMENT A: CUP Application <br /> ATTACHMENT B: CEQA Checklist <br /> ATTACHMENT C: Sita Plan <br /> ATTACHMENT D: Consolidated Emergency Response Plan <br />
The URL can be used to link to this page
Your browser does not support the video tag.