My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023-2024
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440011
>
COMPLIANCE INFO_2023-2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2025 11:10:10 AM
Creation date
2/26/2024 2:27:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023-2024
RECORD_ID
PR0440011
PE
4445 - TRANSFER STATION - MONTHLY INSPECTION
FACILITY_ID
FA0006918
FACILITY_NAME
FORWARD RESOURCE RECOVERY FACI
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106003
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
Lookup Error
ERROR [57014] ERROR: canceling statement due to statement timeout; Error while executing the query
Site Address
9999 S AUSTIN RD MANTECA 95336
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
284
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Compostable Materials Handling Operation and Facility Inspection <br /> Report ( 93 ) <br /> Forward Resource Recovery Facility (39-AA-0020 ) <br /> 1 /24/2023 <br /> and overs were not measured due to weather conditions . <br /> 3 . The following temperatures were measured during the inspection : <br /> - Incoming green waste ranged from 60 ° F to 76 ° F . <br /> - Windrows ranged from 132 ° F to 133 ° F . <br /> 4 . Minimal amount of litter observed on neighboring properties . <br /> 5 . The 4th Quarter SB1383 measurements were received by EHD on January 11 , 2023 . <br /> 6 . The lab analysis report for November 2022 was provided to the EHD ; the facility is meeting <br /> state minimum standards . <br /> 7 . An annual report summarizing all reporting requirements is due January 31 , 2023 . <br /> 8 . Ponding observed on various areas of the site . <br /> Attachments <br /> Forward Resource Recovery Facility Photos <br /> CalRecycle Solid Waste Information System ( SWIS ) Page 2 of 2 <br /> n . 41 &� .. , a _ A . I ,.. ... . . ,.. .,.. , nn nnno 03 . nn nee <br />
The URL can be used to link to this page
Your browser does not support the video tag.