My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2024
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
290
>
2300 - Underground Storage Tank Program
>
PR0231438
>
COMPLIANCE INFO_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 8:49:17 PM
Creation date
2/28/2024 11:15:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2024
RECORD_ID
PR0231438
PE
2361 - UST FACILITY
FACILITY_ID
FA0003716
FACILITY_NAME
SUPER STOP GAS & LIQUOR*
STREET_NUMBER
290
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
22309101
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
290 C N MAIN ST MANTECA 95336
Suite #
C
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br />Secondary Containment Testing Report Form <br />8. SUMP/UDC TEST <br />Test Method Developed by ❑ Manufacturer ❑ Industry Standard ❑x Professional Engineer <br />Test Type ❑ Pressure ❑ Vacuum ❑x Hydrostatic <br />Test Equipment Used: Caldwell Level Change Indicator <br />Sump/UDC ID <br />1 -91 -PS <br />2-Dsl-PS <br />3 -87 -PS <br />Bravo <br />Sump Manufacturer <br />Western FG <br />Western FG <br />Western FG <br />10" <br />Sump Depth (inches) <br />54" <br />54" <br />55" <br />BP <br />Sump Bottom to Top of <br />Highest Pipe Penetration <br />(inches) <br />26" <br />15" <br />21" <br />9:37 <br />Test Start Time <br />9:32 <br />8:47 <br />8:42 <br />.001 <br />Initial Reading <br />.001 <br />.001 <br />.001 <br />10:07 <br />Test End Time <br />10:02 <br />9:17 <br />9:12 <br />.001 <br />Final Reading <br />.001 <br />.001 <br />.001 <br />0 <br />Change in Reading <br />0 <br />0 <br />0 <br />> .002 <br />Pass /Fail Criteria <br />> .002 <br />> .002 <br />> .002 <br />© Pass ❑ Fail <br />Tightness Test Results <br />© Pass ❑ Fail <br />© Pass ❑ Fail <br />® Pass ❑ Fail <br />❑ Pass ❑ Fail <br />Sump/UDC ID <br />UDC 1&2 <br />UDC 3&4 <br />UDC 5&6 <br />UDC 7&8 <br />Sump Manufacturer <br />Bravo <br />Bravo <br />Bravo <br />Bravo <br />Sump Depth (inches) <br />10" <br />10" <br />10" <br />10" <br />Sump Bottom to Top of <br />Highest Pipe Penetration <br />(inches) <br />BP <br />BP <br />BP <br />BP <br />Test Start Time <br />8:52 <br />8:57 <br />9:37 <br />9:42 <br />Initial Reading <br />.001 <br />.001 <br />.001 <br />.001 <br />Test End Time <br />9:22 <br />9:27 <br />10:07 <br />10:12 <br />Final Reading <br />.001 <br />.001 <br />.001 <br />.001 <br />Change in Reading <br />0 <br />0 <br />0 <br />0 <br />Pass/Fail Criteria <br />> .002 <br />> .002 <br />> .002 <br />> .002 <br />Tightness Test Results <br />❑x Pass ❑ Fail <br />❑x Pass ❑ Fail <br />© Pass ❑ Fail <br />® Pass ❑ Fail <br />Additional copies of this page may be attached. <br />All tests marked "Fail' and any repairs made before or during the tightness test must be described in <br />the COMMENTS section. <br />Page 3of5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.