Laserfiche WebLink
Underground Storage Tank <br /> Overfill Prevention Equipment Inspection Report <br /> 6. OVERFILL PREVENTION EQUIPMENT DETAILS <br /> Tank ID (one OPE per column) 87 91 Diesel <br /> Are both vent and tank riser piping F✓ Yes F] Yes F Yes © Yes <br /> secondarily contained? © No ® No r] No © No <br /> OPE Model 71 SO 71 SO 71 SO <br /> What is the OPE response when M Shut off 0 Shut off 0 Shut off 0 Shut off <br /> activated? Flow Flow Flow Flow <br /> (Check all that apply.) © Restricts ®Restricts © Restricts © Restricts <br /> Flow Flow Flow Flow <br /> © Audible ❑I� Audible ❑M Audible rl Audible <br /> Alarm Alarm Alarm Alarm <br /> © Visual ® Visual ❑t— Visual ® Visual <br /> Alarm Alarm Alarm Alarm <br /> Are flow restrictors installed on vent piping © Yes* r] Yes* rl Yes* © Yes* <br /> that may interfere with the OPE operation? [ No ®✓ No ✓1 No © No <br /> At what level in the tank is the OPE set to 104.625 106.875 105.125 <br /> activate? Inches from bottom of tank <br /> What is the percent capacity of the tank at 93.9 94.8 94.5 <br /> which the OPE activates? <br /> Is the OPE in proper operating condition to ®✓ Yes ✓® Yes* F1 Yes* 0 Yes* <br /> respond when the stored substance © No r] No © No © No <br /> reaches the designated regulatory level? <br /> 7. SUMMARY OF TESTING RESULTS <br /> OPE Inspection Results KI Pass E Pass Pass 0 Pass <br /> © Fail © Fail © Fail El Fail <br /> 8. COMMENTS <br /> Describe all answers marked "No"or "Fail"and proposed remedy. <br /> List all monitoring equipment either replaced or repaired. <br /> * Mark here if: <br /> 0 Flow restrictors interfere with overfill prevention and equipment repairs required. <br /> Additional copies of this page may be attached. <br /> Attach tank chart(s), measurements, calculations, and In-Tank Setup report(s) <br /> Page 2 of 2 <br />