Laserfiche WebLink
- 2 - <br /> PA- 2400017 (A) <br /> 2 ) The Driveway approach shall be improved in accordance with the requirements of San <br /> Joaquin County Improvement Standards Drawing No . 17 prior to issuance of the <br /> occupancy permit . ( Development Title Section 9 - 607 . 040 ) <br /> 3 ) The Traffic Impact Mitigation Fee shall be required for any incremental traffic resulting from <br /> this application . The fee is due and payable at the time of building permit application . The <br /> fee will be based on the current schedule at the time of payment . The fee shall be <br /> automatically adjusted July 1 of each year by the Engineering Construction Cost Index as <br /> published by the Engineering News Record . ( Resolutions R- 00 -433 ) <br /> 4 ) The Regional Transportation Impact Fee shall be required for any incremental traffic <br /> resulting from this application . The fee is due and payable at the time of building permit <br /> application . The fee will be based on the current schedule at the time of payment . <br /> ( Resolution R- 06 - 38 <br /> 5 ) The Water Supply Facilities Impact Mitigation Fee shall be required for this development . <br /> The fee is due and payable prior to issuance of the building permit . The fee will be based <br /> on the current schedule at the time of payment . ( Development Title Section 9 - 803 . 020 and <br /> Resolutions R - 91 - 327 , R- 94 - 185 and R - 97 - 5 ) <br /> 6 ) The developer shall provide drainage facilities in accordance with the San Joaquin County <br /> Development Standards . Retention basins shall be fenced with six ( 6 ) foot high chain link <br /> fence or equal when the maximum design depth is 18 inches or more . Required retention <br /> basin capacity shall be calculated and submitted along with a drainage plan for review and <br /> approval , prior to release of building permit . ( Development Title Section 9 - 606 ) <br /> 7 ) A copy of the Final Site Plan shall be submitted prior to release of building permit . <br /> 8 ) This project is subject to the NPDES Region - Wide Permit requirements and shall comply <br /> with the following conditions . Prior to release of the building permit , plans and calculations <br /> shall be submitted and approved by the Public Works Department — Water Resources <br /> Division ( 209 - 468 - 3605 ) : <br /> a ) Treatment : A registered professional engineer shall design the site to treat the 85th <br /> percentile storm as defined in the County ' s 2023 Storm Water Quality Control Criteria <br /> Plan ( SWQCCP ) . <br /> b ) Hydromodification : A registered professional engineer shall design the site to comply <br /> with the volume reduction requirement outlined in the County ' s 2023 SWQCCP <br /> c) Trash : A registered professional engineer shall design the site to comply with the trash <br /> control requirement outlined in the County ' s 2023 SWQCCP . <br /> 9 ) Prior to release of the building permit , the owner shall enter into an agreement with San <br /> Joaquin County for post- construction maintenance of stormwater quality facilities . <br /> 10 ) Prior to release of the building permit the applicant shall submit a Storm Water Quality <br /> Control Plan ( SWQCP ) to Public Works that complies with all requirements of the 2023 <br /> SWQCCP . <br />