My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0016068
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
3550
>
2600 - Land Use Program
>
PA-2400017
>
SU0016068
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:59:12 PM
Creation date
3/6/2024 7:49:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0016068
PE
2632
FACILITY_NAME
PA-2400017
STREET_NUMBER
3550
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215-
APN
17916043
ENTERED_DATE
2/6/2024 12:00:00 AM
SITE_LOCATION
3550 S HWY 99
RECEIVED_DATE
3/5/2024 12:00:00 AM
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- 2 - <br /> PA- 2400017 (A) <br /> 2 ) The Driveway approach shall be improved in accordance with the requirements of San <br /> Joaquin County Improvement Standards Drawing No . 17 prior to issuance of the <br /> occupancy permit . ( Development Title Section 9 - 607 . 040 ) <br /> 3 ) The Traffic Impact Mitigation Fee shall be required for any incremental traffic resulting from <br /> this application . The fee is due and payable at the time of building permit application . The <br /> fee will be based on the current schedule at the time of payment . The fee shall be <br /> automatically adjusted July 1 of each year by the Engineering Construction Cost Index as <br /> published by the Engineering News Record . ( Resolutions R- 00 -433 ) <br /> 4 ) The Regional Transportation Impact Fee shall be required for any incremental traffic <br /> resulting from this application . The fee is due and payable at the time of building permit <br /> application . The fee will be based on the current schedule at the time of payment . <br /> ( Resolution R- 06 - 38 <br /> 5 ) The Water Supply Facilities Impact Mitigation Fee shall be required for this development . <br /> The fee is due and payable prior to issuance of the building permit . The fee will be based <br /> on the current schedule at the time of payment . ( Development Title Section 9 - 803 . 020 and <br /> Resolutions R - 91 - 327 , R- 94 - 185 and R - 97 - 5 ) <br /> 6 ) The developer shall provide drainage facilities in accordance with the San Joaquin County <br /> Development Standards . Retention basins shall be fenced with six ( 6 ) foot high chain link <br /> fence or equal when the maximum design depth is 18 inches or more . Required retention <br /> basin capacity shall be calculated and submitted along with a drainage plan for review and <br /> approval , prior to release of building permit . ( Development Title Section 9 - 606 ) <br /> 7 ) A copy of the Final Site Plan shall be submitted prior to release of building permit . <br /> 8 ) This project is subject to the NPDES Region - Wide Permit requirements and shall comply <br /> with the following conditions . Prior to release of the building permit , plans and calculations <br /> shall be submitted and approved by the Public Works Department — Water Resources <br /> Division ( 209 - 468 - 3605 ) : <br /> a ) Treatment : A registered professional engineer shall design the site to treat the 85th <br /> percentile storm as defined in the County ' s 2023 Storm Water Quality Control Criteria <br /> Plan ( SWQCCP ) . <br /> b ) Hydromodification : A registered professional engineer shall design the site to comply <br /> with the volume reduction requirement outlined in the County ' s 2023 SWQCCP <br /> c) Trash : A registered professional engineer shall design the site to comply with the trash <br /> control requirement outlined in the County ' s 2023 SWQCCP . <br /> 9 ) Prior to release of the building permit , the owner shall enter into an agreement with San <br /> Joaquin County for post- construction maintenance of stormwater quality facilities . <br /> 10 ) Prior to release of the building permit the applicant shall submit a Storm Water Quality <br /> Control Plan ( SWQCP ) to Public Works that complies with all requirements of the 2023 <br /> SWQCCP . <br />
The URL can be used to link to this page
Your browser does not support the video tag.