Laserfiche WebLink
7� E h <br /> %f 0"4 <br /> CALIFORNIA WATER SERVICE <br /> Stockton District 1602 E Lafayette St, Stockton, CA 95205 <br /> �9TFR SER,`` Tel: (209) 464-8311 <br /> February 16, 2023 <br /> Chris VanderVeen <br /> C V anderV een@nsen g.net <br /> Will Serve Letter <br /> Address : 2706 & 3009 Pock Ln APN# 179420-13117942044, & 179-12041 <br /> Dear Mr. VanderVeen, <br /> California Water Service Company Stockton District ("Cal Water") has determined that water is available to <br /> serve the above-referenced project based on the information provided. Cal Water agrees to operate the water <br /> system and provide service in accordance with the rules and regulations of the California Public Utilities <br /> Commission (CPUC) and the company's approved tariffs on file with the CPUC. This determination of water <br /> availability shall remain valid for hi o years from the date of this letter. If construction of the project has not <br /> commenced within this two ,year time frame, Cal Water will be under no further obligation to serve the project <br /> unless the developer receives all updated letter from Cal Water reconfirming water availability. Additionally, <br /> Cal Water reserves the right to rescind this letter at any time in the event its water supply is severely reduced <br /> by legislative, regulatory or environmental actions. <br /> Cal Water will provide such potable water at such pressure as may be available from time to time as a result <br /> of its normal operations per the company's tariffs on file with the CPUC. Installation of facilities through <br /> developer finding shall be made in accordance with the current ales and regulations of the CPUC including, <br /> among others, Tariff Rules 15 and 16 and General Order 103 -A. In order for us to provide adequate water for <br /> domestic use as well as fire service protection, it may be necessary for the developer to fund the cost of special <br /> facilities, such as, but not limited to, booster pumps, storage tanks and/or water wells, in addition to the cost <br /> of mains and services. Cal Water will provide more specific information regarding special facilities and fees <br /> after you provide us with your improvement plans, fire department requirements, and engineering fees for this <br /> project. <br /> This letter shall at all times be subject to such changes or modifications by the CPUC as said Commission <br /> may, from time to time, require in the exercise of its jurisdiction. <br /> If you have any questions regarding the above, please call me at (209)464-8311 . <br /> SincVDai <br /> Bre <br /> Construction Superintendent — Stockton District <br /> cc: Raslrni Kashyap — Cal Water Engineering Dept <br /> File <br /> Quality. Service. Value. <br /> cahwater.com OL <br /> n <br />